My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/11/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 02/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:21:46 AM
Creation date
2/26/2020 11:00:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/11/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
808
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 4. Configuration of the NCAT Permeameter in attempts at field permeability testing <br />2.2.4 Evaluation using ground penetrating radar <br />Field work in support of the project research included ground penetrating radar (GPR) testing of <br />pavement sections. GPR data was continuously collected at residential roadway speeds (20-40 miles per <br />hour) using equipment mounted with 400 MHz and 2 GHz antennas and a SIR-20 control and data <br />acquisition processor. The GPR configuration used for the study met or exceeded the ASTM D4748 and <br />ASTM D6087 standards. Multiple passes were conducted to ensure that sufficient data was collected at <br />13 locations across five municipalities. The truck -mounted antenna is shown in Figure 5. All GPR data <br />was coupled with precise GPS location data in support of more sophisticated analysis, which is <br />presented in Chapter 3. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.