My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/10/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 03/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:42:06 PM
Creation date
3/10/2020 12:47:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 6. 1. <br />Meeting Date: 03/10/2020 <br />By: Chloe McGuire Brigl, Community <br />Development <br />Information <br />Title: <br />PUBLIC HEARING: Introduce Ordinance #20-03 Vacating Drainage and Utility Easement and Adopt Resolution <br />#20-041 Approving Riverstone 4th Addition Final Plat (Project No. 19-149) <br />Purpose/Background: <br />The purpose of this case is to review a Final Plat application from Capstone, LLC (the "Applicant") for Riverstone <br />4th Addition. The City Council previously approved a revised Preliminary Plat (overall master plan) for <br />Riverstone. This Final Plat approves construction for 67 lots of this overall plan. The Final Plat is generally <br />consistent with the revised Preliminary Plat and extends the utilities to the parcel directly adjacent to the property to <br />the west. <br />The vacation of underlying drainage and utility easements is a common process during the Final Plat stage of <br />development, and the Final Plat includes standard drainage and utility easements across each individual property <br />and stormwater ponding. This is a typical step in the Final Plat process. <br />Notification: <br />Staff attempted to notify all property owners within 700 feet via standard U.S. mail of the Public Hearing and <br />published the Notice of Public Hearing in the Anoka County UnionHerald. <br />Observations/Alternatives: <br />Final Plat <br />The proposed Final Plat is consistent with the approved Preliminary Plat for Riverstone which gives the project <br />entitlement. The Final Plat extends utilities to the property to the west. The Final Plat will plat 67 lots per the <br />attached final plat sheet. <br />The project is contingent upon the Puma Street reconstruction project which will realign the road on the northern <br />end with Okapi Street. The development agreement (attached) and resolution (attached) note that the Certificates of <br />Occupancy (CO) are contingent upon the recorded and executed contract for the road reconstruction. The road <br />reconstruction will improve sight lines and capacity. By doing so, the project will improve safety in the area, align <br />roadways which is a positive benefit for public safety, and move the intersection to a safer location based on grades <br />onsite. <br />Alternative <br />Alternative 1: Introduce Ordinance #20-03 and Adopt Resolution #20-041 Approving Riverstone 4th Addition. This <br />will move the project forward, though there will be an additional meeting required to finalize the adoption of <br />Ordinance #20-03. Staff is supportive of this alternative. <br />Alternative 2: Deny Ordinance #20-03 and Resolution #20-041. This will stop the project. Staff is not supportive of <br />this alternative as the final plat is consistent with the preliminary plat, which provides entitlement to the project. <br />Funding Source: <br />The Applicant is responsible for all costs associated with the request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.