Laserfiche WebLink
Public Works Committee 6. 2. <br />Meeting Date: 03/16/2020 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Staff Updates on Improvement Projects and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed improvement projects <br />within the City, and on other items of interest to the Committee. <br />City Improvement Projects <br />• The COR Regional Infiltration Basin (#18-09) <br />• Lift station not operable; control panel installed January 2020 <br />• Working on plan to remove 8,000 CY sand stockpile <br />• Processing Change Order #1 addressing excess topsoil removal/backfill <br />• Final completion by June 30, 2020 per LRRWMO Permit <br />• Ford Brook Estates Street Reconstructions (#19-01) <br />• Punch list work and final payment in 2020 <br />• Wood Pond Hills and Chestnut Ridge Street Reconstructions (#19-03) <br />• Punch list work and final payment in 2020 <br />• RTC 9th Addition Pond Lining Improvements (#19-06) <br />• Punch list work and final payment in 2020 <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />• Staff is collecting topographic survey data for design in 2020 <br />• Construction proposed for 2021 <br />• Hedgehog Street Drainage Improvements (#19-10) <br />• First bids rejected due to high costs <br />• Second bids will be advertised soon <br />• Construction proposed for 2020 <br />• Variolite Street Reconstruction (#20-01) <br />• See separate case <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Anoka County and City of Ramsey share is $150,000 each (per $1.5M est.) <br />• Anoka County beginning project design in 2020 <br />• Construction proposed to begin in 2022 pending City and County approvals <br />• Anoka County is considering moving construction up to 2021 <br />• CSAH 116 & TH 47 Intersection Improvements <br />• Constructing additional turn lanes to improve congestion and safety in 2021 <br />• Staff will present a detailed review of this project in April (time permitting) <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Proposed for construction 2022 - 2024 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />