Laserfiche WebLink
• Proposed for construction 2022 - 2024 <br />• Preliminary design on hold <br />• MnDOT exploring realignment of Highway 47 to remove S-curve <br />• Requires relocation of Alter Recycling... in discussions <br />. Rum River Bridge Replacement <br />• MnDOT requested funding to replace bridge 2022 - 2024 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Items of Interest <br />• Northwest Metro Surface Water Supply Feasibility Study <br />• Member cities include Corcoran, Dayton, Ramsey and Rogers <br />• MCES is funding 100% using Clean Water Funds <br />• Reviewing final draft of study on March 19, 2020 <br />• Final study completion anticipated in April 2020 <br />• City of Ramsey Centralized Water Treatment Facility Study <br />• Water System Model — Complete, undergoing final calibration <br />• Source Water Analysis — Nearly complete <br />• Pilot Study completed, favorable results <br />• Designing preliminary plant layout <br />• Touring other WTF's in March / April <br />• Staff will present a detailed review in April (time permitting) <br />• Ramsey Gateway Highway 10 Improvements <br />• Preferred vision layout complete <br />• RFP issued for preliminary design of Ramsey Blvd. improvements <br />• Reduced Speed Limits on Local Streets <br />• No new requests received since last discussed <br />• Monitoring discussions underway in Minneapolis and Saint Paul <br />Timeframe: <br />Staff estimates up to 15 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />N/A <br />Funding Source: <br />N/A <br />Recommendation: <br />N/A <br />Action: <br />No formal action required. For Committee review and discussion purposes only. <br />No file(s) attached. <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Grant Riemer Grant Riemer 03/12/2020 11:15 AM <br />Kurt Ulrich Kurt Ulrich 03/12/2020 04:25 PM <br />Form Started By: Bruce Westby Started On: 03/10/2020 09:54 AM <br />