Laserfiche WebLink
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />March 17, 2020 <br />Mr. Bruce Westby, P.E. <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />RE: Proposal for Engineering Services <br />Puma Street Improvement Project (City Improvement Project #20-04) <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph:(7631433-2851 <br />Fax: (7631 427-0833 <br />Bolton-Menk.com <br />Dear Mr. Westby: <br />We appreciate the opportunity to present this scope of services for the Puma Street Improvement project. <br />Our scope and fees were prepared based on our understanding of the project and our previous experience <br />in delivering State Aid projects. <br />The following proposal is based on our December 13, 2019 discussion related to the project, your <br />02/25/2020 email update, as well as the Future Business Park study and the recently constructed Bunker <br />Lake Boulevard and Puma Street Improvements project. <br />SCOPE <br />The improvements will be generally as described in our December 3, 2015 report for the Future Business <br />Park. The phasing will be as generally described in our March 2017 Update Report. The improvements <br />will consist of the following items as presented in the above reports, depicted on the attached figures, and <br />as constructed in 2018: <br />• Puma Street construction will include the Phase 2 area identified in the Business Park Study <br />Update, which includes street and utility improvements from the Puma Street lift station to Alpine <br />Drive. <br />• A 10-foot bituminous trail will be constructed along the west side of Puma Street. <br />• 10-inch sanitary sewer and 16-inch watermain will extend the entire length of the project. <br />• The Alpine Drive and Puma Street intersection will be relocated to line up with Okapi Street NW. <br />Project scope assumptions used in creating this fee proposal include the following: <br />• A full topographic survey was previously completed. Only verification survey is required. <br />• The Developer will design the storm pond and provide an easement to the City. We will <br />coordinate discharge of the street stormwater into this pond. <br />• No additional turn lanes will be added to Alpine Drive at this time. Additional development and <br />traffic may warrant turn lanes in the future. <br />• The Right -of -Way plat for the road realignment will be provided by the City. <br />• State Aid formatted plans, including plan review checklist and spread calculations are required. <br />Onitan & Men11 is an equal appartunil if rmplayer. <br />