Laserfiche WebLink
I. INTRODUCTION <br />The Ramsey City Council and Ramsey Economic Development Authority (EDA) identified the need <br />to prepare for the development of a new business park within the City. The City identified a large <br />area of privately owned green -field space located on the north side of Trunk Highway 10, west of <br />Armstrong Boulevard, for a future Ramsey Business Park. A report was prepared in late 2015 and <br />early 2016 which reviewed traffic impacts and outlined infrastructure needs related to the <br />business park area. That report is incorporated by reference to this update. <br />Development pressures have resulted in proposed land use changes for a portion of the study <br />area. Phasing of the development activities in this area is also different than previously <br />anticipated. As a result, the City requested an update to the previous analysis. <br />The previous report provided a comprehensive analysis of the study area. This update focuses <br />primarily on areas located adjacent to Puma Street, with a more cursory review of the remaining <br />study area. Infrastructure needed and potential cost allocations related to the required <br />improvements are included in this review. <br />The overall study area boundary remains unchanged from the previous study (see Figure 1). <br />II. LAND USE UPDATES <br />The primary land use changes relate to the area west of Puma Street and north of Bunker Lake <br />Boulevard. The area west of Puma Street was previously a combination of Business Park and <br />Medium Density Residential, and will now be all Medium Density Residential. The area north of <br />Bunker Lake Boulevard had been Public, and will now be Business Park (see Figure 2 for updated <br />land uses). <br />III. PRELIMINARY CONSIDERATIONS <br />The previous study described the roadway and public utility improvements required to serve the <br />study area. <br />Public utility improvements are based on information contained in the City's Comprehensive Plans <br />for sanitary sewer and water. The proposed updates in land use for this specific area are not <br />anticipated to change the strategies contained in those Comprehensive Plans. The sanitary sewer <br />and water system improvements, as outlined in the previous study, are still considered as base <br />requirements for developments occurring in this area. <br />Roadway improvements require additional analysis based on the new land uses. Both the Average <br />Annual Daily Traffic (AADT) and the Peak Hour turning movements are expected to change due to <br />the updated land uses. The required roadway geometrics (number of through lanes, turns lanes, <br />etc.) will be reviewed and compared to those described in the previous study. <br />Traffic patterns are expected to change as a result of the changes in land use. For example: <br />• For Business Park uses, traffic would be expected to enter the area in the morning (AM Peak <br />Hour) and leave in the evening (PM Peak Hour). <br />• For Residential uses, traffic would be expected to leave the area during the AM Peak Hour and <br />return during the PM Peak Hour. <br />• For Public, or School, uses, traffic would be expected to enter the area during the AM Peak <br />Hour, leave during an early PM Peak Hour, and not impact the traditional PM Peak Hour. Also, <br />Prepared by: Bolton & Menk, Inc. <br />Future Business Park —City of Ramsey Page 2 <br />