My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 03/24/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:44:13 PM
Creation date
4/8/2020 2:50:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
special events at School properties typically occur at off-peak times, creating congestion outside <br />of the typical peak hours. <br />The updated land uses include Business Park areas being converted to residential, and also Public <br />areas being converted to Business Park. <br />IV. DISCUSSION OF PHASES/IMPROVEMENTS <br />The previous analysis considered a phasing plan beginning a quarter of a mile west of Armstrong <br />Boulevard and then systematically extending to the west along Bunker Lake Boulevard and then <br />north along Puma Street. New development pressures create a revised phasing strategy for <br />implementation of infrastructure improvements. <br />A Preliminary Plat is anticipated for the 87.8 acre property immediately west of Puma Street and <br />extending from the Union Pacific Railroad tracks to Alpine Avenue. This area is anticipated to <br />ultimately contain 351 lots and be phased from south to north. <br />The current phasing strategy is depicted on Figure 3. A discussion of the phasing, along with <br />required infrastructure improvements is described below: <br />A. Phase 1A <br />The phase 1A improvements are as depicted on Figure 4. The developments will include <br />both Residential and Business Park uses. <br />The public utility improvements will consist of extending the sanitary sewer and water <br />mains to Puma Street. The utilities will need to be extended beyond the future roadway <br />improvements to avoid the need to impact those facilities when future phases occur. <br />The roadway improvements will include construction of Bunker Lake Boulevard from the <br />previously constructed west access to the former school property to Puma Street. <br />B. Phase 1B <br />See Figure 5 for the anticipated Phase 1B development area. The improvements will include <br />both Residential and Business Park uses, extending north from the Phase 1A development <br />area. The Phase 1B development area is anticipated to extend to the low area along Puma <br />Street. <br />The public utility improvements will consist of extending the sanitary sewer and water <br />mains north along Puma Street. The utilities will need to be extended beyond the future <br />roadway improvements to avoid the need to impact those facilities when future phases <br />occur. <br />The roadway improvements will include construction of Puma Street from Bunker Lake <br />Boulevard to the low area along Puma Street. <br />C. Phase 2 <br />See Figure 6 for the anticipated Phase 2 development area. The improvements are <br />anticipated to consist entirely of residential uses, extending from the low area along Puma <br />Street to Alpine Drive. <br />The public utility improvements will consist of extending the sanitary sewer and water <br />mains north along Puma Street. The utilities will need to be extended to Alpine Drive, with <br />consideration given to future extensions along Alpine Drive. <br />The roadway improvements will include construction of Puma Street from the low area <br />Prepared by: Bolton & Menk, Inc. <br />Future Business Park —City of Ramsey Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.