My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 03/24/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:44:13 PM
Creation date
4/8/2020 2:50:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o The eastbound approach should include a left turn lane, two through lanes, <br />and one right turn lane. <br />• Bunker Lake Boulevard (west of commercial section to Puma Street): <br />o Expand to a three lane section for development. <br />o Right turn lanes (locations and lengths) will be determined based on <br />development type. Right turn lanes will typically be required where <br />development related trips are anticipated to be more than 100 per day. <br />• Puma Street: <br />o Expand to a three lane section for development (two through lanes and one <br />center left turn lane). Depending on what type of developments occur on <br />the east side of Puma Street, and where those accesses are located, Puma <br />Street could potentially remain as a two lane roadway. <br />o Right turn lanes (locations and lengths) will be determined based on <br />development type. <br />• Bunker Lake Boulevard & Puma Street Intersection: <br />o An all -way stop or single lane roundabout will operate adequately at this <br />intersection for the 2040 Full -Build conditions. A southbound left turn lane <br />and westbound right turn lane are recommended for an all way stop. <br />c. Mid -Term Improvements <br />• See attached Traffic Memorandum in Appendix B. <br />d. Long -Term Improvements <br />• See attached Traffic Memorandum in Appendix B. <br />e. Discussion of Findings <br />• The required improvements within the study area can be implemented based on the <br />phasing plan described above. Each series of improvements for Bunker Lake Boulevard <br />and Puma Street can be implemented as the properties immediately adjacent to the <br />roadways are developed. <br />• Puma Street could potentially be developed as a two lane section with right and left <br />turn lanes at key access points. This will depend on access point locations, type of <br />development on the east side of Puma Street, and location of accesses along the <br />corridor. We recommend proceeding with the three lane section at this time due to <br />the uncertainties of development in the area. <br />• For Phase 1A, right turn lanes will most likely be required both eastbound and <br />westbound along Bunker Lake Boulevard and southbound along Puma Street at <br />proposed access locations. Temporary paving will be required to transition back to the <br />existing Bunker Lake Boulevard and the existing Puma Street. <br />• For Phase 1B, right turn lanes will most likely be required both northbound and <br />southbound along Puma Street at proposed development access locations. Temporary <br />paving will be required to transition back to the existing Puma Street. <br />• For Phase 2, right turn lanes will most likely be required both northbound and <br />southbound along Puma Street at proposed development access locations. <br />Prepared by: Bolton & Menk, Inc. <br />Future Business Park —City of Ramsey Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.