Laserfiche WebLink
2. INTRODUCTION <br />2.1 Authorization <br />Preparation of this feasibility report was authorized by the Ramsey City Council on December 10, <br />2019. <br />2.2 Program Overview <br />This feasibility report explores proposed 2-inch bituminous pavement mill and overlay <br />improvements to approximately 2.82 miles of public streets in the Regency Pond residential <br />neighborhood and in the Business Park 95 industrial park, along with associated appurtenant <br />improvements. This project is designated as Amended 2020 Pavement Overlay Improvements, <br />Improvement Project #20-02A. <br />This feasibility report explores the necessity, feasibility and cost-effectiveness of the proposed <br />improvements by examining the scope of the improvements, exploring estimated costs and <br />available funding sources, and determining whether the improvements should be completed as <br />proposed or in connection with other improvements. <br />2.3 Scope <br />The scope of this report addresses proposed 2-inch bituminous pavement mill and overlay <br />improvements to approximately 2.82 miles of public streets in the Regency Pond residential <br />neighborhood and in the Business Park 95 industrial park as shown in Appendix A. <br />Feasibility Report <br />Amended 2020 Pavement Overlay Improvements <br />City of Ramsey Project No. 20-02A <br />2 <br />