My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 03/24/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:44:13 PM
Creation date
4/8/2020 2:50:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. EXISTING CONDITIONS <br />3.1 Existing Streets <br />3.1.a Regency Pond Residential Neighborhood <br />The existing right-of-ways along the street segments proposed to receive overlays as part of this <br />project are 60-feet in width. The paved street width is 30-feet as measured from curb to curb. All <br />streets in this project were constructed as urban sections with bituminous pavement and concrete <br />curb and gutter between 1996 and 1998. <br />The streets segments proposed to receive overlays in 2020 have 2018 PASER ratings between 6 <br />and 8, which are generally considered to be good candidates for mill and overlay improvements. <br />To verify that the pavement sections were thick enough and had adequate structural capacity to <br />support 2-inch mill and overlay improvements, Staff hired WSB and Associates to complete a <br />pavement forensics analysis, which included the extraction of pavement cores from each street <br />segment proposed to receive mill and overlay improvements. The pavement forensics report is <br />included in Appendix D of this report. <br />Based on the general condition and thickness of the existing pavement sections, WSB and <br />Associates and City Staff do not recommend completing mill and overlay improvements on these <br />street segments as proposed. It is estimated that the existing streets should remain serviceable with <br />moderate maintenance for up to 10 years. Once PASER ratings fall to 3 or less, a full -depth <br />reclamation (FDR) or reconstruction project should be completed. <br />3.1.b Business Park 95 Industrial Park <br />The existing right-of-ways along the street segments proposed to receive overlays as part of this <br />project range from 66 to 80-feet in width. The paved street widths range from 38 to 44-feet as <br />measured from curb to curb. All streets in this project were constructed as urban sections with <br />bituminous pavement and concrete curb and gutter between 1995 and 1998. <br />The streets segments proposed to receive overlays in 2020 have 2018 PASER ratings between 6 <br />and 7, which are generally considered to be good candidates for mill and overlay improvements. <br />To verify that the pavement sections were thick enough and had adequate structural capacity to <br />support 2-inch mill and overlay improvements, Staff hired WSB and Associates to complete a <br />pavement forensics analysis, which included the extraction of pavement cores from each street <br />segment proposed to receive mill and overlay improvements. The pavement forensics report is <br />included in Appendix D of this report. <br />Feasibility Report <br />Amended 2020 Pavement Overlay Improvements <br />City of Ramsey Project No. 20-02A <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.