My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 04/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:46:29 PM
Creation date
4/15/2020 2:53:07 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br />Project B2001583 <br />March 5, 2020 <br />Page 3 <br />Recommendations <br />Prior to installing the drain tile system, we recommend cleaning up and reconstructing the in slopes <br />along both sides of the roadway between Stations 87+00 and 90+00. This will remove any buildup of non - <br />permeable soils, and allow for proper day lighting of the aggregate base and subgrade soils out to the in <br />slopes. We recommend the in slopes be maintained at 3H:1V, or flatter along the alignment. In addition, <br />we recommend reconstructing the ditches along both sides of the roadway between Stations 87+00 and <br />90+00. If feasible, we recommend re -grading and subcutting the existing ditch bottoms 1 foot between <br />Stations 87+00 and 88+00 and 2 feet between Stations 88+00 and 90+00 to allow for more defined <br />drainage along the roadway. <br />We recommend incorporating a minimum of 12 inches of select granular material meeting the MnDOT <br />Specification 3149.2.B.2 below the aggregate base. We recommend installing a 4-inch perforated PVC <br />pipe with geotextile wrap directly beneath the bottom of the aggregate base section within the sand <br />subbase layer. These drains should be placed perpendicular to the roadway at 50-foot intervals between <br />Stations 88+00 and 90+00. The drain tile system should be day lighted within the sand subbase section <br />out to the edges of the roadway and discharge a minimum of 1 foot above the bottom of the re -graded <br />ditch. We have included a typical drawing from MnDOT's Standard Plan 5-297.433 for Typical Edge Drain <br />and Discharge Cross Section for your reference. <br />Figure 1. Typical Edge Drain and Discharge Cross Section <br />I FT. MIN. <br />SHOULDER <br />DRIVING LANE <br />2 7.. MIN. <br />7 F• <br />4.. PRECAST SEE SUBSURFACE DRAIN BET AILS <br />CONCRETE HEADWALL a <br />4" DIA. TP PIPE DRAIN <br />SECTION VIEW <br />TYPICAL EDGE DRAIN AND DISCHARGE CROSS SECTION 0 <br />SEE TABULATION FOR LOCATIONS ) <br />BRAUN <br />INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.