Laserfiche WebLink
Criteria and Measures Points % of Total <br />Points <br />Measure A - Transit, bicycle, or pedestrian project elements and <br />connections <br />8. Risk Assessment <br />Measure A- Risk Assessment Form <br />9. Cost Effectiveness <br />Measure A — Cost effectiveness (total points awarded/total project <br />cost) <br />Total <br />100 <br />75 7% <br />75 <br />100 9% <br />100 <br />1,100 <br />5IPage <br />