Laserfiche WebLink
Criteria and Measures <br />Points % of Total <br />Points <br />6. <br />Safety <br />Measure A - Crashes reduced <br />Measure B — Pedestrian Crash Reduction (Proactive) <br />7. Multimodal Elements and Existing Connections <br />Measure A - Transit, bicycle, or pedestrian project elements and <br />connections <br />8. Risk Assessment 75 7% <br />Measure A- Risk Assessment Form 75 <br />9. Cost Effectiveness 100 9% <br />Measure A — Cost effectiveness (total points awarded/total project 100 <br />cost) <br />16% <br />Total <br />180 <br />150 <br />30 <br />110 <br />110 <br />1,100 <br />10% <br />71Page <br />