My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/28/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 04/28/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:47:04 PM
Creation date
4/24/2020 1:27:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/28/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: 04/28/2020 <br />Submitted For: Grant Riemer, Engineering/Public Works <br />By: Grant Riemer, Engineering/Public Works <br />Information <br />Title: <br />Status update on New Public Works Building Design and Cost Estimates <br />7. 1. <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to bring the council up to date on where staff and consultants are in the design of the <br />new PW building. Representatives from both RJM Construction, the city's construction management firm on the <br />project, and Oertel Architects, the city's design firm, will be on hand to explain where we are in the process, how <br />we arrived there, and to answer any questions the council may have. <br />Notification: <br />N/A <br />Observations/Alternatives: <br />The City of Ramsey has long planned for a new public works facility and added it to our Capital Improvement Plan <br />(CIP) in 2006. The land was secured in 2008 by the purchase of the former Bury -Carlson site. That purchase was <br />finalized in 2013 and the BKV Group was hired in 2015 to perform a space needs study. In September of 2019, <br />council authorized the hiring of RJM Construction to over see the construction of the new PW facility, followed by <br />the hiring of Oertel Architects in February of 2020 to provide architectural/engineering services. Attached to this <br />case are draft site plans, building layout, and conceptual design drawings from Oertel Architects. Also attached are <br />the preliminary budget numbers for the project provided by RJM construction <br />Funding Source: <br />Staff prepared a summary showing the recommended applicable percentage of staff and capital costs related to <br />Enterprise funded activities (Water, Sewer, Storm Water utility) in relation to total costs of capital/personnel costs <br />attributed to the public works division. Based on this calculation, approximately 34% of costs is attributed to the <br />city's utility funds. <br />Using the 34% enterprise rate, the Public Works funding scenario would be as follows: <br />Enterprise funds would make up $6,222,000 of the total (i.e., $18.3M estimated) <br />• Water: $2,736,000 <br />• Sewer $2,736,000 <br />• St Lt: $250,000 <br />• Storm: $500,000 <br />Total Enterprise $6,222,000 <br />Other Funds: <br />Landfill Trust Fund: $2.2M (brings fund to $0) <br />Facility Fund: $1.0M <br />Total Other $3.2 M <br />
The URL can be used to link to this page
Your browser does not support the video tag.