ESTIMATE DATE: April 21, 2020
<br />PROJECT: City of Ramsey Public Works
<br />ARCHITECT: Oertel
<br />DRAWING DATE: March 19, 2020
<br />Base
<br />Sisf
<br />DESCRIPTION I Notes I Estimate I 86,018
<br />Construction Costs
<br />Concrete & Masonry $1,141,473 $13.27
<br />Precast Plank & Wall Panels $2,310,857 $26.86
<br />Structural Steel and Misc Metals $1,124,680 $13.07
<br />Rough Carpentry $50,000 $0.58
<br />Finish Carpentry/Millwork $81,783 $0.95
<br />Waterproofing $70,141 $0.82
<br />Air & Vapor Barrier $30,400 $0.35
<br />Metal Panel & Metal Roof $262,955 $3.06
<br />Roofing $950,000 $11.04
<br />Joint Sealants $25,000 $0.29
<br />Doors, Frames, Hardware $128,524 $1.49
<br />Overhead Doors $267,236 $3.11
<br />Storefront & Glazing Systems $187,582 $2.18
<br />Translucent Wall Panels $132,214 $1.54
<br />Gypsum Drywall $97,921 $1.14
<br />Tile $83,653 $0.97
<br />Acoustical Ceilings $23,713 $0.28
<br />Carpet & Resilient Flooring $8,913 $0.10
<br />Fluid Applied Flooring $75,445 $0.88
<br />Flooring Moisture Mitigation System $0 $0.00
<br />Painting & Wallcovering $173,756 $2.02
<br />Specialties $59,010 $0.69
<br />Appliances $0 $0.00
<br />Window Treatments $0 $0.00
<br />Site Furnishings $20,000 $0.23
<br />Conveying $85,000 $0.99
<br />Vehicle Lifts $330,000 $3.84
<br />Fueling and Lubrication System $590,000 $6.86
<br />Washbay Equipment $50,472 $0.59
<br />Fire Protection $174,800 $2.03
<br />Plumbing $1,179,400 $13.71
<br />HVAC $1,508,500 $17.54
<br />Electrical $1,625,000 $18.89
<br />Phone & Data Rough in included in Electrical $0 $0.00
<br />Audio & Visual Rough in included in Electrical $0 $0.00
<br />Fire Alarm Included in Electrical $0 $0.00
<br />Security Systems Rough in included in Electrical $0 $0.00
<br />Earthwork $300,000 $3.49
<br />Asphalt Paving $535,500 $6.23
<br />Site Concrete $168,065 $1.95
<br />Fencing $107,730 $1.25
<br />Landscaping & Irrigation $150,000 $1.74
<br />Site Utilities $122,455 $1.42
<br />Surveying $10,350 $0.12