My WebLink
|
Help
|
About
|
Sign Out
Home
02/27/01
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
2000's
>
2001
>
02/27/01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 4:03:38 PM
Creation date
5/13/2003 2:39:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
02/27/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FC CASE <br /> <br />CONSIDER AUTHORIZATION OF HIGHWAY #10 <br />REDEVELOPMENT PLANNING SERVICES ADDENDUM <br />By: James E. Norman, City Administrator <br /> <br />Background: <br /> <br />The City contracted for planning services with Hoisington Koegler Group Incorporated (HKGi) <br />on May 20, 1999, to perform a planning study for redevelopment along the Highway #10 <br />corridor. The report was presented and accepted in November 2000. As part of the study, an <br />area north of Highway/ti 0 between Sunfish Lake Boulevard and Ramsey Boulevard was used as <br />a focus area for the study of a proposed fromage road system. The study discussed opportunities <br />and constraints and made a recommendation where a frontage road system would be constructed. <br /> <br />The Ramsey Economic Development Authority (EDA) directed HKGi to provide a quote for the <br />same services with two additional segments. The two additional segments include the north side <br />of Highway #I0 from Sunfish Lake Boulevard to the Anoka/Ramsey corporate limits and the <br />north side of Highway #10 from Ramsey Boulevard to where the Highway #10 right-of-way and <br />BNSF right-of-way intersect. The amendment to the study would be similar to the original study <br />that would include the evaluation and graphical presentation of existing conditions, opportunities <br />and constraints, and the preparation of a frontage road and redevelopment concept for each <br />segment of the corridor. HKGi would complete this requested service for a fee not to exceed <br />$5,000. <br /> <br />Recommendation: <br /> <br />During the EDA meeting of February 21, 2001, it was recommended that the City Council <br />consider authorizing the HKGi Highway # 10 redevelopment study addendum for a not-to-exceed <br />cost of $5,000. Funding for the services would come from the EDA fund. <br /> <br />Council Action: <br /> <br />Motion to authorize HKGi to perform a Highway #10 redevelopment planning study addendum. <br /> <br />Reviewed by: <br /> <br />City Administrator <br />Finance Officer <br />Community Development Director <br /> <br />FC: 02/27/01 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.