Laserfiche WebLink
AWARD BIDS FOR 2005 PUBLIC WORKS CAMPUS IMPROVEMENTS <br /> By: Grant Riemer, Public Works Supervisor <br /> <br />Background: <br /> <br />On I)ccembcr 14, 2004 the City Council passed Resolution 04-12-375 authorizing the <br />solicitation of bids for re-siding the existing metal building at the Public Works campus <br />mtd lbr thc purchase of a temporary office building for the Public Works campus; <br />combined cost not to exceed $250,000.00. Bids were opened on April 14, 2005. The <br />I~¢llowing is a summary of the bids received. <br /> <br />Metal BuildingRe-siding <br /> <br />Bidder <br />Structural Buildings <br />Ebcrt Construction <br />Encomm Midwest <br />Tricon Construction <br />Interstate Roofing <br /> <br />AmountofBid <br />$163,063.00 <br />$174,700.00 <br />$202,202.00 <br />$207,491.00 <br />$264,844.00 <br /> <br />Temporary Office Building <br /> <br />Bidder Amount of Bid <br />GE Capitol $79,956.10 <br /> <br />Recommendation: <br /> <br />Staff' recommends that Council adopt Resolutions 05-04-XXX and 05-04-XXX awarding <br />re-siding bid to low bidder, Structural Buildings Inc., in the amount of $163,063.00. The <br />bid For thc temporary office building to the respective low bidder GE Capitol in the <br />al11Otlllt Of $79,956.10. <br /> <br />Council Action: <br /> <br />Adopt Rcsoltltions 05-04-XXX and 05-04-XXX awarding re-siding and temporary office <br />building projects to the respective low bidders of Structural Buildings in the amount of <br />$163,063.00 and GE Capitol in the amount of $79,956.10. <br /> <br />Reviewed by: <br /> <br />[~ublic Works Dircctor <br />Pri~cipal City Engineer <br />(;ity Attorney <br /> <br />CC: 04/26/05 <br /> <br /> <br />