CC Regular Session 5. 9. <br />Meeting Date: 05/26/2020 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title <br />Adopt Resolution #20-105 Accepting Bids and Awarding Contract for 2020 Crack Sealing Improvements, <br />Improvement Project #20-00 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #20-105 accepting bids and awarding a construction contract for <br />2020 Crack Sealing Improvements, Improvement Project #20-00. <br />Background: <br />Crack seal improvements are completed annually on between 13 and 23 miles of public street segments to <br />cost-effectively maximize the life of the bituminous pavement. Crack sealing protects pavement by preventing <br />stormwater runoff from seeping through cracks in the pavement and joints between the pavement and concrete curb <br />and gutter and utility castings, reducing future pavement damage due to wet subgrade soils, especially during <br />freeze -thaw cycles. <br />The City's current pavement maintenance schedule calls for public streets to be crack sealed the third, seventh, and <br />fourteenth year following construction, reconstruction, and overlay improvements. However, while this is the <br />typical maintenance schedule it is important to note that Staff reviews the condition of all streets annually and <br />adjusts the schedule of maintenance operations based on actual pavement conditions. <br />A total of 15.74 miles of public street segments are proposed to receive crack seal improvements in 2020. These <br />street segments were selected based on age, pavement maintenance history, and Pavement and Surface Evaluation <br />Rating (PASER) values. Crack seal improvements are typically performed on pavement sections with PASER <br />ratings of 7 or higher. Staff also attempts to select street segments that are in relatively close proximity to each other <br />in an attempt to receive lower bid prices for mobilization and traffic control bid items. <br />Plans and specifications for the 2020 Crack Sealing Improvements were prepared in-house as part of Staff's normal <br />duties. A copy of the plans are attached to this case. <br />Also attached is a figure showing which streets are proposed to receive crack seal improvements to the entire <br />pavement surface (red lines) versus streets that are only proposed to receive crack seal improvements along the <br />seam between the pavement and concrete gutter (blue lines). This is an area of special concern since gutters convey <br />large volumes of stormwater runoff and the seam between the pavement and gutter runs parallel to the direction of <br />flow. Therefore, any time this seam opens up it can allow significant volumes of water to infiltrate into and beneath <br />the pavement section. <br />Work is anticipated to occur between mid -June and mid -August. The work generally takes two to three weeks to <br />complete after the Contractor commits crews to the project. Staff will maintain a project webpage, and will update <br />it as new information is made available. Letters will not be mailed to notify the public of the 2020 crack seal <br />improvements since the work occurs quickly and has little to no impact on the traveling public or abutting <br />properties. <br />Notification: <br />