retention on site was determined to be unable to handle additional stormwater capacity from the site, <br />and that given the water level of the existing feature and ground water level shown in initial feedback <br />from geotechnical exploration, infiltration areas of a significant size were required, which included <br />additional calculation time and design time to locate and size on site drawings. Fees listed below are <br />actual incurred costs. <br />Senior Engineer 6 $192.26 $1,153.56 <br />Staff Engineer 6 $123.65 $741.90 <br />Engineer/Designer 18 $108.44 $1,951.92 <br />Total Civil Engineering Request $3,847.38 <br />STRUCTURAL ENGINEERING <br />Structural Engineering as a design discipline is a calculation -based design practice that is predicated on <br />building size. Based on the size illustrated in the preferred option of the RFP, they determined their fee <br />based on a scope and size of building requiring a specific amount of calculation. Included in that design <br />fee is all design phases and construction administration services, such as shop drawing review and <br />requests for additional information. Given the added square footage, there will be added design <br />calculations to accommodate the additional building size for foundations, bearing structures and <br />overhead structure. There will be added review time for shop drawings for these items as well. The <br />addition of the alternate adds only minor complexity to the scope of the project. The additional fee <br />would include hours for various levels of staff, including Principals, Engineers, CADD technicians and BIM <br />Coordinators to execute the final design. The blended rate for the structural engineer per the RFP is <br />$129 per hour. This additional fee request equates to an additional 124 hours of engineering. <br />Total Structural Engineering Request: $16,000.00 <br />MECHANICAL AND ELECTRICAL ENGINEERING <br />Mechanical and Electrical Engineering designs are also very calculation based. Fees and scopes are <br />determined by estimating work effort and hours based on the size of the facility and the calculation and <br />design time required to accommodate that size of project. Calculations and designs for these <br />engineering disciplines are rooted in code -based requirements based on building size (Cubic Feet per <br />Minute of Air changes, electrical loading based on lighting density, fire suppression hazards and <br />requirements, to illustrate a few examples). <br />Emanuelson Podas has two separate requests based on the scope determined during the programming <br />and schematic design phases. They have additionally provided work tasks that have increased in scope <br />to illustrate the additional effort. <br />Add Services no. 1: Expanded Base Building <br />The additional size for the base bid building is roughly 24,000 larger than the scheme illustrated in the <br />RFP. This includes the addition of locker rooms and the complexity of that area (not included in the <br />2015 space needs study). The additional size increases the size of the calculations for equipment sizing, <br />3 <br />