Laserfiche WebLink
HVAC pathway planning, code -based equipment and feature requirements, additional shop drawing and <br />product review and additional time to review work on site. <br />HVAC Engineering and Design Additional Tasks <br />Energy Recover for Locker Rooms <br />HVAC for Shops with Air -Conditioned Offices <br />Expanded Office and Maintenance Areas <br />Construction Administration for the above <br />Additional Hours 68 $140 $9,520 <br />Plumbing Engineering and Design Additional Tasks <br />Added trench drains <br />Water drop locations <br />Compressed air drops <br />Natural gas piping <br />Roof Drainage and Storm sewer coordination <br />Construction Administration for the above <br />Additional Hours 36 $140 $5,040 <br />Electrical Engineering and Design Additional Tasks <br />Additional Power Distribution <br />Additional Motor scheduling <br />Additional Lighting and Control <br />Additional Signal Design (Low Voltage Coordination) <br />Construction Administration for the above <br />Additional Hours 48 $140 $6,720 <br />Additional Services No. 1 total $21,280.00 <br />Add Services no. 2: Alternate Additional Square Footage <br />The additional size for the proposed alternate building addition adds more square footage to the overall <br />building, increasing the amount of calculation and design efforts required. Based on discussions with <br />the engineer, Oertel Architects estimates that the premium for the "Alternate", versus base bid, is about <br />15% of the estimated total for the additional design fee request. All fee requests below include added <br />Construction Administration time for the additional scope. <br />HVAC Engineering and Design Additional Tasks <br />Make-up Air and Supply Ducting and Exhaust Fan and Ducting <br />Added fume detection and extraction <br />Added supplemental heat design <br />Additional Hours 28 $140 $3,920 <br />4 <br />