Laserfiche WebLink
• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />• Proposed for construction 2022 - 2024 <br />• Preliminary design on hold <br />• MnDOT exploring realignment of Highway 47 to remove S-curve <br />• Requires relocation of Alter Recycling... still in discussions <br />• Rum River Bridge Replacement <br />• MnDOT requested funding to replace bridge in 2022 - 2024 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• Northwest Metro Surface Water Supply Feasibility Study <br />• Member cities include Corcoran, Dayton, Ramsey and Rogers <br />• MCES is funding 100% using Clean Water Funds <br />• Reviewing final draft of study in late June <br />• Final study completion anticipated in July 2020 <br />• City of Ramsey Centralized Water Treatment Facility Study <br />• Water System Model — Complete <br />• Source Water Analysis — Complete <br />• Pilot Study completed <br />• Preliminary plant layout completed <br />• Touring Andover and Brooklyn Center water treatment facilities late June / early July <br />• Draft Study completion anticipated June 22nd <br />• Study presentation to City Council anticipated July 21 st (special CCWS) <br />• Ramsey Gateway Highway 10 Improvements <br />• Preliminary / Final design of Ramsey Blvd. improvements in progress <br />• Reduced Speed Limits on Local Streets <br />• No new requests received since last discussed <br />• Monitoring discussions underway in Minneapolis and Saint Paul <br />Timeframe: <br />Staff estimates up to 20 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />N/A <br />Funding Source: <br />N/A <br />Recommendation: <br />N/A <br />Action: <br />No formal action required. For Committee review and discussion purposes only. <br />No file(s) attached. <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Grant Riemer Grant Riemer 06/11/2020 10:55 AM <br />Kurt Ulrich Kurt Ulrich 06/11/2020 12:59 PM <br />