My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/21/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 07/21/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:28:40 AM
Creation date
7/16/2020 3:50:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Proposed for construction 2022 - 2024 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />• Proposed for construction 2022 - 2024 <br />• Preliminary design on hold <br />• MnDOT exploring realignment of Highway 47 to remove S-curve <br />• Requires relocation of Alter Recycling... still in discussions <br />• Rum River Bridge Replacement <br />• MnDOT requested funding to replace bridge in 2022 - 2024 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• NW Metro Surface Water Supply Feasibility Study <br />• Member cities include Corcoran, Dayton, Ramsey and Rogers <br />• MCES is funding 100% using Clean Water Funds <br />• Final study completion anticipated August/September 2020 <br />• City of Ramsey Centralized Water Treatment Facility Study <br />• Water System Model — Complete <br />• Source Water Analysis — Complete <br />• Toured Andover and Brooklyn Center WTF's last week <br />• Feasibility Study — Final draft under review/FTP link emailed to CC <br />• SEH presenting draft study findings this evening <br />• Ramsey Gateway Highway 10 Improvements <br />• Final design of Ramsey Blvd. improvements in progress <br />• Anoka County awarded $40M for Ramsey Gateway Hwy 10 Improvements <br />• NW Metro Mississippi River Crossing Feasibility Analysis (NEW) <br />• See attached overview <br />• TH 47 Safety Study (NEW) <br />• See attached study introduction email <br />• Reduced Speed Limits on Local Streets <br />• No new requests received since last discussed <br />• Monitoring discussions in Minneapolis and Saint Paul <br />Timeframe: <br />Staff estimates up to 10 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />N/A <br />Funding Source: <br />N/A <br />Recommendation: <br />N/A <br />Action: <br />No formal action required. For Committee review and discussion purposes only. <br />Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.