Laserfiche WebLink
Public Works Committee 6. 1. <br />Meeting Date: 07/21/2020 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Receive Staff Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />• The COR Regional Infiltration Basin (#18-09) <br />• Drivers were placed and the lift station is operable and being tested <br />• Change Order(s) needed to address excess topsoil removal / backfill and muskrat protection <br />improvements <br />• LRRWMO Permit expires September 30, 2020 <br />• Ford Brook Estates Street Reconstructions (#19-01) <br />• Punch list work underway with final payment 2020 <br />• Wood Pond Hills and Chestnut Ridge Street Reconstructions (#19-03) <br />• Punch list work underway with final payment 2020 <br />• RTC 9th Addition Pond Lining Improvements (#19-06) <br />• Punch list work underway with final payment 2020 <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />• Construction proposed for 2021 <br />• Hedgehog Street Drainage Improvements (#19-10) <br />• Construction complete <br />• Final payment anticipated Fall 2020 <br />• Variolite Street Reconstruction (#20-01) <br />• Preconstruction conference conducted July 16th <br />• Mass mailing included proposed project schedule, contact information, anticipated access and traffic <br />impacts, etc. <br />• Reclamite Pavement Rejuvenator Pilot Project (NEW) <br />• Alternate to sealcoat improvements...see attached product brochure <br />• Applied on Ute St. from Alpine Dr. to 154th Ln. on 7/16/20 for $2,800 <br />• Staff will evaluate performance and consider larger project for 2021 <br />• More details including photos and videos to be presented August 18th <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Anoka County and City of Ramsey share is $150,000 each (per $1.5M est.) <br />• Construction proposed for 2022, pending City and County approvals <br />• Anoka County is considering moving construction up to 2021 <br />• CSAH 116 & TH 47 Intersection Improvements <br />• Constructing additional turn lanes to improve congestion and safety in 2021 <br />• Staff will this project in detail with the PWC this fall <br />