Laserfiche WebLink
Bqqmjdbou!Sftqpotf <br />Vqebufe!Cz <br />Len LintonLen LintonLen Linton <br />PMPMPM <br />Nbslvq!Ebuf <br />07/29/2020 3:23 07/29/2020 3:23 07/29/2020 3:23 <br />Dibohfnbsl!Efubjmt <br />The project to the south showed stormwater overflow from their pond onto this site. The overflow route for this site must be called out on the preliminary plat.This muist be a full <br /> cul-de-sac, loosing the lots on either side of the stub until the next phase develops.The proximity of this stub to the south line of the solar farm limits future development until <br /> the solar farm is closed and the land redeveloped.Trunk Sanitary Sewer will require deducation of adequate drainage and utility easements. Layout may need to be changed to provide <br /> the necessary easements.A forcemain from the lift station will also be required which will require additional easement width. <br />Dibohfnbsl!Tvckfdu <br />Stormwater RouteCul-de-sacTrunk Sanitary Sewer <br />Nbslvq!Obnf <br />LLLLLL <br />Gjmf <br />Riverstone South Sketch Plan.pdfRiverstone South Sketch Plan.pdfRiverstone South Sketch Plan.pdf <br />Tobqtipu <br />Efqbsunfou <br />Civil Engineer IVCivil Engineer IVCivil Engineer IV <br />Tubuvt <br />UnresolvedUnresolvedUnresolved <br />Dpnqmfuf@ <br />FalseFalseFalse <br />282930 <br />Sfg!$ <br />Riverstone South (Project No. 19-152)07/20/2020 11:00 AM07/30/2020 01:04 PM <br />Dzdmf <br />1 <br />Hspvqjoh <br />Dibohfnbslt!Sfqpsu!Qspkfdu!Obnf;!Xpslgmpx!Tubsufe;!Sfqpsu!Hfofsbufe;! <br />Main Workflow <br /> <br />