My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/10/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 08/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:52:39 PM
Creation date
8/10/2020 2:30:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT LOCATION: The City of Ramsey (City) is requesting quotes from Contractors <br />(Contractor) to relocate 8,000 cubic yards of clean fill (sand) from Site A to Site B as described in <br />the project scope section of this Request for Quotes (RFQ). All sites are owned by the City. Sites <br />A and B are located approximately one-half mile apart. The enclosed exhibit shows the general <br />location of each project site. <br />PROJECT SCOPE: The overall scope of this work includes salvaging and stockpiling existing <br />topsoil for each site (salvaged topsoil from Site A to be stockpiled on Site A, salvaged topsoil from <br />Site B to be stockpiled on Site C); loading and hauling 8,000 cubic yards of clean fill (sand) from <br />Site A to Site B; unloading, placing and compacting the fill on Site B in uniform one -foot thick <br />lifts; spreading the salvaged topsoil uniformly across each site; and establishing turf on each site. <br />Finished side slopes must be 1:6 or flatter. The existing clean fill stockpile on Site A was placed <br />on existing topsoil and turf, therefore after the clean fill is hauled off Site A the underlying topsoil <br />must be scarified and leveled before establishing turf, which will be considered incidental to <br />construction. The City will inspect all construction, and will coordinate the required compaction <br />testing with the City's geotechnical consultant prior to and during placement of all fill. All work <br />must be completed per the direction of and to the satisfaction of the City. Once work has <br />commenced, the Contractor shall continuously pursue completion until work is complete. <br />DELIVERABLES: <br />• Signature Page — The enclosed Signature Page must be completed in its entirety and <br />submitted, including signature(s). <br />• Quote Form - The enclosed Quote Form must be completed in its entirety and submitted. <br />COMMUNICATION WITH CITY: If any requirements of this RFQ are not clearly understood, <br />Contractor is responsible for promptly contacting City for further clarification. Responses to <br />inquiries that substantially modify or clarify the RFQ will be forwarded by addenda. <br />SUBMISSION OF QUOTE: A signed copy of the attached quote form must be submitted to the <br />City by 2:00 P.M. Wednesday August 5, 2020. Deliver to the Ramsey Municipal Center, 7550 <br />Sunwood Drive NW, Ramsey, MN 55303 to the attention of Aaron Madsen, Engineering <br />Technician IV. Quotes received by the submittal deadline via fax or e-mail will be accepted. <br />2 <br />RFQ - MUNICIPAL PLAZA PARK FILL <br />CITY IMPROVEMENT PROJECT #20-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.