My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/10/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 08/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:52:39 PM
Creation date
8/10/2020 2:30:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL UNDERSTANDING: By submitting a quote, Contractor agrees to be bound to the <br />terms and conditions herein. <br />COSTS OF PREPARATION: Under no conditions will any costs for preparation of the quote <br />be reimbursed by the City. <br />LICENSE AND INSURANCE: By submitting a quote, Contractor affirms they shall maintain <br />the following minimum insurance coverage while completing their work as related to this RFQ in <br />the following amounts: Commercial General Liability $1,000,000 per occurrence (written on an <br />occurrence -based form bodily injury and property damage); automobile liability $1,000,000 per <br />occurrence (including hired & non -owned bodily injury and property damage). The City of <br />Ramsey shall be named as an additional insured on the Commercial General Liability insurance. <br />Certificates of Insurance for all of the above insurance shall be filed with the City prior to the <br />work. Contractor also affirms they shall be licensed to perform the work in the State of Minnesota, <br />and the work shall comply with all state and local laws. <br />WORKING HOURS: The work shall be carried out during normal working hours so as not to <br />cause any unreasonable nuisance to affected residents and businesses. Under emergency <br />conditions, this limitation may be waived in writing by the Engineer in conjunction with qualified <br />local authority. Normal working hours for this work are considered to be from 7:00 a.m. to 7:00 <br />p.m., Monday through Friday. <br />WORK AND STAGING AREAS: Contractor shall confine their work activities within the right <br />of way at all times. No equipment shall be left on city streets outside normal working hours. <br />TRAFFIC CONTROL: Contractor will be required to follow the most current edition of the <br />Temporary Traffic Control Zone Layout Manual. <br />SPECIFICATION REFERENCES: Contractor shall conduct all work in confonnance with the <br />specifications set forth herein and in accordance with the most current edition of the Minnesota <br />Department of Transportation Standard Specifications for Construction, which is incorporated by <br />reference to these specifications. <br />3 <br />RFQ - MUNICIPAL PLAZA PARK FILL <br />CITY IMPROVEMENT PROJECT #20-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.