My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/10/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 05/10/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:48:57 PM
Creation date
5/9/2005 9:27:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/10/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT MEMOtL~.NDU-M - S.P. 0206-55 (T.H. 47) <br /> <br />Beginning Endi~ Description .... Spe'ed'li'mi~ <br />Reference Reference <br />Point Point <br /> 34,256 34.802 ] ~ mile south of CSAH 24 to C~,~H 81. r.. <br /> Four-lane rural divided roadway. <br /> <br /> Proposed Pro.iect <br /> Listed below are the impro~,ements that have been considered along this section of TH 47. <br /> <br /> Pavement Preservation <br /> 1) On TH 47, mill 2 inches and overlay 2 inches from the north end 'of the TH 10 bridge (Reference <br /> Point 20+00.682) to Coolidge Sl~eet (Reference Point 22+00.033); a distance of approximately [.4 <br /> miles. <br />2) On TH 47, milt 2inches and overlay 2inches from 700' north of 180~' Lane (Reference Point <br /> 27+00.775) to Coun~ Road 8 !. in St. Francis (Reference Point 3z[+00802); a distance of <br /> <br /> · approximately 6.8 miles. <br />3) A three-inch thick layer of aggregate will be placed on existing ag~regate shoulders, for the eutire <br /> length of the project. ,4. drop-off next tn the bituminous pavement has formed in 'many areas along <br /> the project. <br /> <br />Inter~vection related work (signals and turn lanes) <br />4) At TH [0 interchange ramp intersections (Reference ~oint 20+00.662 and 20+00.703); replace the <br /> two existing traffic signals. These signals are.old, and Metro Traffic has asked that the signals be <br /> replaced. This work is currently part of SP 0206-58. <br />5) At Pleasant Street (Reference Point 2ffq-00,777) TH 47 ia a four-lane undivided urban roadway, ha <br /> Mn/DOT's 2000 to 2002 trunk Highway Intersections Database, this.intersection ranks 159'~ out <br /> of nearly 4000 intersections, based on crash costs. Metro Traffic has proposed re-striping TH 47 <br /> fi'om two though-lanes in each direction, to a left turn-lane and one though-lane in each direction <br /> at Pleasant Street. The existing traffic signal will be revised to provide a reft rum signal. <br />6) At the entrance to SCI Recycling Service (west side of TH 47, just north of the railroad tracks; <br /> Reference Point 2 i+00), Metro Traffic ~ proposed constructing a north bound bypass lane at the <br /> SCI Recycling Service entrance (see Figure 7 on page 4). This will allow northbound traffic to <br /> bypass vehicles turning into to SCI Recycling Service. Metro Traffic has also proposed adding a <br /> raised median between northbound and southbound lanes on either side of the railroad tracks. A <br /> faml crash occurred when southbound traffic went around the railroad crossing gate by crossing <br /> into the northbound lanes. The vehifile was struck by a Wain. The raised median will make it more <br /> difficult.for vehicles to go around the railroad crossing gates. <br /> At McKinley Street (Reference Point 21+00.585), Metro Traffic proposed adding left and right <br /> mm-lanes on TH 47, andre-aligning McKinley Street west of TH 47, so that the though-lanes east <br /> and west of the intersection would line-up across from each other. Metro Traffic met with <br /> residents in the area in December 2004. The residents wanted a signal at the McKinley Street <br /> intersection; however Metro Traffic h~ determined that the intersection does not meet traffic <br /> signal warrants. In January, the Anoka City council voted to delay any,work at the intersection, <br /> and to do fi. wther study. No improvements will l~e made at McKinley Street as part of this <br /> project. <br />8) At I42nd Avenue (Reference Point 22+00.420), TH 47 was reconstructed in the late 1.990s. TH 47 <br /> at this intersect/on is a two-lane divided urban roadway with [eft and right tom-lanes in both <br /> directions to 142nd Avenue, and raised center median. Metro Traffic has worked with the City of <br /> Rarnsey, and decided to prevent'traffic on 142nd Avenue from crossing TH 47, or making left- <br /> tums onto TH 4'7. Left tums from TH 47 to 142~a Avenue, and fight-toms from 142'~ Avenue to <br /> TH 47 will be permitted. This will be done by extending the raised center median, and adding <br /> raised-islands on the [42nd Avenue approaches to TH 47. ' ' <br /> <br />page 2 <br /> <br />File: MNDOT_DOCS~415149-v6- PROJECT_MEMORAND UM <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.