My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/10/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 05/10/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:48:57 PM
Creation date
5/9/2005 9:27:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/10/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT MEMORANDUM - S.P. 0206-55 (T.H. 47) <br /> <br />9) At 144"` Avenue (also referred to as Nowthen Boulevard and CSAH 5, Reference Point <br />22+00.688), a southbound acceleration lane will be added from eastbound t44"` Avenue. The <br />acceleration lane will be built within Mn/DOT fight-of-way. <br />10) At 157'~ Avenue (Reference Point 24+00.516), a northbound bypass lane will be added. The <br />existing right turn-lane to 156'` Avenue will be extended north, past the Rum River Boy Scout <br />Camp entrance and 157'` Avenue, to form the bypass lane. <br />1 I) 600 feet south of 167o" Avenue CReference Point 25+00.67), a hump in the vertical profile of the <br />roadway will be lowered roughly two feet. This hump ca,es a sight restriction to and from the <br />167"' Avenue intersection. A 300-foot long section of TH 47 will need to be reconstructed to <br />remove this hump. <br />12) Az County Road 66 (Reference Point 28+00.204), Metro Traffic recommended adding mm-lanes.. <br />Turn-lanes will not be added to this intersection as part of thi~ project due to the lack of <br />right-of-way needed to construct the turn-lanes. <br />I3) At Vega Drive (Reference Point 28+00.497), Metro Traffic recommended adding turn-lanes. <br />Turn-lanes will not be added to this intersection as part of this project, due to the lack of <br />right-of-way needed to. construct the mm-lanes. <br />14) At 222"~ Avenue (Reference Point 33+00.164), Metro Traffic recommended adding mm-lanes. <br />Turn-lanes will not be added to this intersection as part of this project due to the lack of <br />right-of-waY needed to construct the mm-lanes. <br />15) At Cree Avenue (Reference Point 33+00.2), the City of Saint Francis has requested that mm-lanes <br />be constructed for a new development north of TH 4.7 (see Figure 6 on page viii), tree Avenue <br />wilt be a new street to serve this development. It will intersect TH 47 across from the ck'iveway- <br />entrance to St. Francis Auto Parts, Inc. Lef~ and fight tumlane to Cree ~Avenue and the St. Francis <br />Auto Parts, Inc. are planed as part ofthis project. Right. of-way is limited on the south side of'TH ' <br />47, along St. Francis Auto Parts, Inc. IfMnDOT's right-of-way is not wide enough to construct <br />right mm-lanes on the south side of'IH 47 at this' location, the fight mm-lanes to St Francis Auto . <br />Parts, Inc. will not be constructed as part of this project. <br />16) At 229~ Avenue (Reference Point 34+00.576), the City of Saint Francis has requested that mm- <br />lanes be ¢onsmacted for the new development mentioned in Item 15), above. TH 47 is a four-lane <br />mr'a[ divided roadway at 229" Avenue. A northbound left tumlane will be constructed in the <br />median area, and a southbound right turn lane will be constructed on the existing shoulder. <br />Micellaneous Imtvrovernentx <br />i7) 106 mailboxes and mailbox supports not meeting Mn/DoT standards have been identified north of <br />Alpine Drive. These mailboxes and support~ will be replaced as part ofthis project. <br />18) Hydraulic work <br /> a~ Martin Street (Reference point 20.866) - Install storm Sewer 2 This Work included adding <br /> 600-feet of curb and gutter and 350-feet of storm sewer pipe. This work will not be <br /> included in this'project. <br /> b. Near CSI Recyling (Reference point 21.0) - Install storm sewer, curb and gutter. This <br /> work will not be included in this project. <br /> e. 229"' Avenue (Reference Point 34+00.576) access to St. Francis Middle School - replace <br /> existing 24-inch corregated metal pipe with a 24-inch reinforced conrete pipe with safety <br /> aprons. <br /> <br />page 3 <br /> <br />File: MiNDOT_DOCS-#415149-v6-PROJE CT_MEMOIL4ND UM <br /> <br />-417~.?' <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.