Laserfiche WebLink
FY2022 LPP Funding Request <br />City of Ramsey — Riverdale Drive Extension <br />Infrastructure Condition — The proposed project extends through an undeveloped portion of the City, where no <br />infrastructure currently exists. The Riverdale Drive extension will ensure these new developments can be <br />accessed via a frontage road system, rather than by TH 10. <br />Project Readiness — The City of Ramsey has delivered two segments of Riverdale Drive through the Local <br />Partnership Program or its predecessors: the Municipal Agreement program and the Cooperative Agreement <br />program. We are aware of the project and plan requirements and are committed to delivering the project if <br />awarded funding. We are in continual communication with developers and will be able to set the final <br />alignment, obtain right-of-way, and proceed to final design quickly. <br />CONTACT INFORMATION <br />For questions related to this proposal, please contact: <br />Bruce Westby, P.E. <br />City Engineer <br />7550 Sunwood Drive NW I Ramsey, MN 55303 <br />763-433-9825 (Direct) I 763-647-4485 (Cell) <br />bwestby@cityoframsey.com <br />REASONS FOR THE PROJECT <br />There are many reasons for completion of the Riverdale Drive extension project. When completed, the proposed <br />project will: <br />• Complete the frontage road system along the south side of TH 10 from Sunfish Lake Boulevard to <br />Bowers Drive, <br />• Complete a portion of the improvements detailed in the Highway 10 Access Planning Study, <br />• Remove two accesses and a median cross -over from TH 10, making the area safer for the traveling <br />public, <br />• Extend the eastbound TH 10 right turn lane at Bowers Drive, <br />• Extend the functionality, or "reach" of the grade separated crossing of TH 10 and the BNSF railroad at <br />Armstrong Boulevard for emergency response vehicles, <br />• Provide access to developments being planned in the area of the improvements, and <br />• Allow infrastructure to be extended into a currently undeveloped portion of the City. <br />ESTIMATED COST SUMMARY <br />The proposed project will include costs for extending City infrastructure into the area to serve developments <br />with roadways, sanitary sewer and watermain. The City is requesting funding to assist with roadway, trail and <br />storm sewer components of the project. The total project costs are estimated at $3,618,000, with the roadway, <br />trail and storm sewer construction costs estimated at $1,675,000. The City is requesting $710,000 of the <br />$1,675,000 in eligible construction costs. <br />The City is committed to preparing a funding package that will include all project costs, including right-of-way, <br />preliminary design, final design, and other City costs required to complete the project. In terms of percentage, <br />the City is requesting approximately 42% of the eligible construction costs, which also equates to less than 20% <br />of the total project costs. <br />