Laserfiche WebLink
FY2022 LPP Funding Request <br />City of Ramsey — Riverdale Drive Extension <br />Requested <br />Improvement Type Eligible Cost City Cost <br />Roadway, Trail, Storm Sewer and TH 10 $ 710,000 $ 965,000 <br />Watermain $ 0 $ 563,000 <br />Sanitary Sewer $ 0 $ 484,000 <br />Right -of -Way $ 0 $ 150,000 <br />Design and Construction Engineering (18% Est) $ 0 $ 490,000 <br />Other Local Project Delivery Costs $ 0 $ 256,000 <br />TOTALS $ 710,000 $2,908,000 <br />BENEFITS TO THE TRUNK HIGHWAY AND LOCAL ROADWAY SYSTEM <br />The project is intended to improve access, mobility and safety along the TH 10 corridor. This improvement was <br />detailed in the Highway 10 Access Planning Study, and will provide benefit to the TH 10 corridor by: <br />• Removing two accesses to TH 10, <br />• Removing a median cross -over from TH 10, <br />• Extend the eastbound TH 10 right turn lane at Bowers Drive, <br />• Providing access to a new area of development and allowing the new traffic to access TH 10 via the <br />Armstrong Boulevard interchange, <br />• Allowing better access for emergency vehicles to the area. <br />TRAFFIC CONTROL DURING CONSTRUCTION <br />The work along TH 10 will include the removal of two private accesses, removal of a median cross -over and <br />associated left turn lanes, and extension of a right turn lane at Bowers Drive. The work is anticipated to be <br />primarily completed using shoulder closures. No lane closures are anticipated. <br />The frontage road will be constructed along a new alignment, minimizing the need for traffic control on the local <br />roadway system. <br />SCHEDULE AND STRATEGY <br />The City has received information from developers indicating there will be a need for the extension of Riverdale <br />Drive in the immediate future. The City will be able to leverage local assessments, State Aid funding, and City <br />trunk utility funding for the project. Those sources, along with Local Partnership Program funding, will allow for <br />a complete financing package to be developed. The project could potentially be designed this winter, bid in the <br />early part of 2021, and constructed in the summer of 2021. <br />ATTACHMENTS AND OTHER INFORMATION <br />Concept Sketch <br />The attached Concept Sketch was originally included in the Highway 10 Access Planning Study. The <br />sketch has been shared with developers and the alignment has been refined over the past several years. <br />The sketch also depicts the access closures, the median cross -over closure and the developing area <br />adjacent to the Riverdale Drive Extension. <br />Existing Conditions <br />The existing conditions can be seen on the attached figure. <br />