My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/09/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 06/09/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:49:40 PM
Creation date
8/31/2020 2:52:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/09/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I� Hakanson <br />NI Anderson <br />Main Office: <br />3 601 Thurston Avenue, Anoka, MN 55303 <br />Phone: 763/427-5860 Fax: 763/427-0520 <br />www.haa-inc.com <br />May 22, 2020 SENT VIA EMAIL: jferiancek@ci.ramsey.mn.us <br />Joe Feriancek <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />RE: Construction Staking Services — City of Ramsey Project 20-01, Variolite Street <br />Dear Mr. Feriancek: <br />Thank you for the opportunity to submit a proposal for our services on the above projects. I understand that the scope of <br />our services is to provide construction staking services as needed and directed for the above project. <br />Hakanson Anderson proposes to conduct this work on an hourly basis based upon the attached hourly rate schedule. <br />SCOPE OF WORK <br />• Office setup and coordination <br />• Verify field control and the existing conditions set site benchmarks <br />• Stake the road centerline for grading <br />• Stake approximately 300 feet of ditch for grading <br />• Stake the silt fence <br />• Stake the sanitary sewer, storm sewer and watermain <br />• Stake curb and gutter <br />• Stake the six pedestrian ramps and sidewalk as needed <br />• Stake road striping <br />Hourly not to Exceed . $19,280.00 <br />➢ Centerline top of gravels "blue tops" every 50 feet add $7,200.00 <br />➢ As -built Survey is not included in this estimate <br />The above stated hourly amount is based on survey control points being found in place, electronic files of necessary <br />construction documents being available for our use and a one-time staking per item. Significant re -staking and services <br />provided in addition to those proposed will be billed hourly per our standard fee schedule. <br />To better serve you, we request that final plans and specifications for new projects arrive in our office a minimum of five <br />working days before staking is needed on site. After staking has started on site, a two to three-day notice for return visits <br />is requested. It is the contractor's responsibility to provide shop drawings or updated plans when applicable. <br />If this proposal meets with your approval, please sign the acceptance below and return a copy to our office. If you have <br />any questions or need any further information, feel free to call at your convenience. 763-852-0486 <br />Sincerely, <br />Hakanson Anderson Associates <br />Brian Person PLS <br />Vice President <br />ACCEPTANCE OF PROPOSAL: The above fees and conditions are satisfactory and hereby accepted. Hakanson <br />Anderson Associates is authorized to do the work as specified. Invoices for the above work will be issued on a monthly <br />basis and at the completion of the project. Payment for invoices will be due within thirty (30) days of the date of billing. <br />Accepted by: Date: <br />Name/Title <br />
The URL can be used to link to this page
Your browser does not support the video tag.