Laserfiche WebLink
Recommendation: <br /> <br />Staff recommends that the contractor be directed to open the roadway as soon as final roadway <br />improvements are completed, and that additional sig-ning and construction fencing be installed and <br />maintained until the permanent fencing is in place. Additional costs associated with this measure should be <br />itemized and billed outside the contract. These costs should be paid for by RLK, Inc. <br /> <br />Committee Action: <br /> <br />Committee should recommend to Council the conditions under which the road should be opened to the <br />public. The committee should also direct action on how the permanent fencing shall be installed, by <br />change order or competitively bid. Committee action on the other two issues shall .be based on discussion. <br /> <br />Reviewed by: <br />City Attorney <br />Director of Public Works <br />Street Maintenance Supervisor <br /> <br />PW: 8/21/01 <br /> <br /> <br />