My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 08/21/2001
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2001
>
Agenda - Public Works Committee - 08/21/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:47:31 PM
Creation date
5/14/2003 2:49:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
08/21/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.W. CASE <br /> <br />CONSIDER AUTHORIZING CONSTRUCTION OF A lVIEZZANINE IN WATER TOWER NO. 2 <br />A CHANGE ORDER TO PROJECT #99-64, <br /> By: Steven J. Jankowski, City Engineer <br /> <br />Background: <br /> <br />During the design of Water Tower No, 2 it was anticipated that there would be a future demand by <br />telecommunications providers to install antennas on and associated equipment within the structure. <br />Storage of off-season City equipment within the base of the tower was the desired usage of the ground <br />space within the base of the tower structure. Design of the' structure anticipated a mezzanine would be <br />constructed to house the telecommunication equipment associated with the antennas. Verizons has <br />approached the City to install the first such antenna on Water Tower No 2. <br /> <br />Attached to this case is a proposal from CB&I Water (the company currently under contract for the <br />construction of the tank) for the' construction of a mezzanine floor structure. The cost of CB&I work <br />would be $115,307. The total cost would include an additional $5,000 for inspection and project <br />observation by AEC Engineering, Inc. Construction of the mezzanine could be complete within about 90 <br />days from the time of authorization. <br /> <br />It should be noted that on August 7th, the Planning Commission meeting recommended approval of a <br />structure to Verizons telecommunications equipment outside of the water tower. <br /> <br />Recommendation: <br /> <br />Staff recommends that the Council authorize entering into this proposal as a change order to the existing <br />contract contingent upon Verizon entering into an agreement with the City to construct their facility with <br />the mezzanine and paying a proportional share of the total project cost (estimated to be 20 to 25 percent of <br />the total cost). <br /> <br />Committee Action: <br /> <br />Motion to recommend to Council that a change order for the construction of a mezzanine in Water Tower <br />No. 2 contingent upon Verizon, Inc. entering into an ageement with the City to fund their proportional <br />share of the project. <br /> <br />Reviewed by: <br />City Attorney <br />Director of Public Works <br />Parks/Utilities Supervisor <br />Finance Officer <br /> <br />PW: 08/21/01 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.