My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/22/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 09/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:07:00 PM
Creation date
10/7/2020 4:16:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKING HOURS: The work shall be carried out during normal working hours so as not to cause any <br />unreasonable nuisance to affected residents and businesses. Under emergency conditions, this limitation may be <br />waived in writing by the Engineer in conjunction with qualified local authority. Normal working hours for this <br />work are considered to be from 7:00 a.m. to 7:00 p.m., Monday through Friday. <br />WORK AND STAGING AREAS: Contractor shall confine their work activities within the right of way at all <br />times. No equipment shall be left on city streets outside normal working hours. <br />TRAFFIC CONTROL: Contractor will be required to follow the most current edition of the Temporary Traffic <br />Control Zone Layout Manual. <br />SPECIFICATION REFERENCES: Contractor shall conduct all work in conformance with the specifications <br />set forth herein and in accordance with the most current edition of the Minnesota Department of Transportation <br />Standard Specifications for Construction, which is incorporated by reference to these specifications. <br />PAYMENT: Partial and final payments will be made upon submittal of each pay request to the City on a net 30 <br />day basis following City acceptance of all work items included on the pay request. An IC 134 form will be <br />required prior to final payment. <br />BASIS OF PAYMENT: Payment shall be made on a lump sum basis for all components of the work as specified <br />in this RFQ. The cost of any additional equipment, labor, materials, permits, tools, and supplies which have not <br />been specifically identified in this section for payment, but are required to complete the work, shall be considered <br />incidental to the project. <br />3 <br />RFQ — 16660 JASPER STREET DRAINAGE IMPROVEMENTS <br />CITY IMPROVEMENT PROJECT #19-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.