Laserfiche WebLink
ENGINEERS ESTIMATE FOR <br />HAMPTON TOWNHOMES <br />71 <br />BIOROLLS- COMPOST LOGS <br />110 <br />LIN FT <br />$2.50 <br />$275.00 <br />72 <br />STORM DRAIN INLET PROTECTION <br />7 <br />EACH <br />$250.00 <br />$1,750.00 <br />73 <br />STABILIZED CONSTRUCTION EXIT <br />1 <br />LUMP SUM <br />$1,300.00 <br />$1,300.00 <br />74 <br />CATEGORY 3 EROSION CONTROL BLANKET <br />920 <br />SQ Y❑ <br />$2.50 <br />$2,300.00 <br />75 <br />TURF ESTABLISHMENT OUTSIDE INFILTRATION BASINS <br />3.5 <br />ACRES <br />$1,100.00 <br />$3,850.00 <br />76 <br />TURF ESTABLISHMENT INSIDE INFILTRATION BASINS <br />0.37 <br />ACRES <br />$2,000.00 <br />$740.00 <br />77 <br />4" SOLID LINE MULTI -COMPONENT <br />57 <br />LIN FT <br />$1.50 <br />$85.50 <br />78 <br />TREES 1 1/2" B&B <br />28 <br />EACH <br />$400.00 <br />$11,200.00 <br />79 <br />TREES2 1/2" B&B <br />25 <br />EACH <br />$450.00 <br />$11,250.00 <br />80 <br />TREE 6' - 0" B&B <br />30 <br />EACH <br />$410.00 <br />$12,300.00 <br />81 <br />PLANTS 24" HT. <br />17 <br />EACH <br />$100.00 <br />$1,700.00 <br />82 <br />PLANTS 4' HT. <br />29 <br />EACH <br />$125.00 <br />$3,625.00 <br />83 <br />4" SOLID LINE MULTI -COMPONENT <br />57 <br />LIN FT <br />$1.50 <br />$85.50 <br />Total Schedule A - HELIUM COURT <br />SCHEDULE B: NOWTHEN BOULEVARD TURN LANE CONSTRUCTION <br />$546,221 <br />ITEM NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />EXTENSION <br />1 <br />MOBILIZATION <br />1 <br />LUMP SUM <br />$8,000.00 <br />$8,000.00 <br />2 <br />REMOVE PAVEMENT MARKER <br />1270 <br />LIN FT <br />$2.00 <br />$2,540.00 <br />3 <br />REMOVE BITUMINOUS PAVEMENT <br />1,283 <br />SQ YD <br />$6.00 <br />$7,698.00 <br />4 <br />REMOVE CONCRETE CURB AND GUTTER <br />33 <br />LIN FT <br />$10.00 <br />$330.00 <br />5 <br />REMOVE SIGN <br />7 <br />EACH <br />$50.00 <br />$350.00 <br />6 <br />REMOVE CULVERT <br />67 <br />LIN FT <br />$20.00 <br />$1,340.00 <br />7 <br />SAW BITUMINOUS PAVEMENT <br />1,310 <br />LIN FT <br />$3.00 <br />$3,930.00 <br />8 <br />SAW CONCRETE CURB AND GUTTER <br />5 <br />LIN FT <br />$10.00 <br />$50.00 <br />9 <br />SUBGRADE PREPARATION <br />12.6 <br />ROAD STA <br />$800.00 <br />$10,080.00 <br />10 <br />SALVAGE AND REPLACE TOPSOIL <br />1 <br />LUMP SUM <br />$3,500.00 <br />$3,500.00 <br />11 <br />EXCAVATION AND GRADING <br />1 <br />LUMP SUM <br />$12,000.00 <br />$12,000.00 <br />12 <br />AGGREGATE BASE CLASS 5 (CV) (P) <br />397 <br />CU YD <br />$35.00 <br />$13,895.00 <br />13 <br />AGGREGATE SHOULDERING CLASS 2 (CV) (P) <br />34 <br />CU YD <br />$40.00 <br />$1,360.00 <br />14 <br />SELECT GRANULAR MATERIAL (CV) (P) <br />915 <br />CU YD <br />$12.00 <br />$10,980.00 <br />15 <br />MILL BITUMINOUS SURFACE (2.0u) <br />146 <br />SQ YD <br />$10.00 <br />$1,460.00 <br />16 <br />TYPE SP 12.5 WEARING COURSE MIXTURE (4,E) 2.0" THICK <br />5,096 <br />SQ YD <br />$11.00 <br />$56,054.78 <br />17 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (4, B) 2.0" THICK <br />2,523 <br />SQ YD <br />$10.00 <br />$25,225.56 <br />18 <br />TACK <br />315 <br />GALLON <br />$6.00 <br />$1,890.00 <br />19 <br />B418 CONCRETE CURB AND GUTTER <br />46 <br />LIN FT <br />$40.00 <br />$1,840.00 <br />17 <br />