Laserfiche WebLink
ENGINEERS ESTIMATE FOR <br />HAMPTON TOWNHOMES <br />20 <br />22" SPAN RC ARCH SAFETY APRON <br />2 <br />EACH <br />$900.00 <br />$1,800.00 <br />21 <br />22" SPAN RC ARCH CULVERT PIPE DESIGN 3006 CLASS IIA <br />68 <br />LIN FT <br />$80.00 <br />$5,440.00 <br />22 <br />TRAFFIC CONTROL <br />1 <br />LUMP SUM <br />$10,000.00 <br />$10,000.00 <br />23 <br />FURNISH SIGN PANELS TYPE C <br />21 <br />SO FT <br />$65.00 <br />$1,365.00 <br />24 <br />FURNISH SIGN PANELS TYPE D - STREET NAME SIGNS <br />12 <br />SO FT <br />$65.00 <br />$780.00 <br />25 <br />BIOROLLS-COMPOST LOGS <br />40 <br />LIN FT <br />$3.00 <br />$120.00 <br />26 <br />CATEGORY 3 EROSION CONTROL BLANKET <br />2311 <br />SO YD <br />$1.50 <br />$3,466.50 <br />27 <br />TURF ESTABLISHMENT <br />0.9 <br />ACRES <br />$1,500.00 <br />$1,350.00 <br />28 <br />4" SOLID LINE MULTI -COMPONENT <br />1,716 <br />LIN FT <br />$0.60 <br />$1,029.60 <br />29 <br />4" DOUBLE SOLID LINE MULTI -COMPONENT <br />1,624 <br />LIN FT <br />$1.20 <br />$1,948.80 <br />30 <br />24" SOLID LINE MULTI -COMPONENT <br />233 <br />LIN FT <br />$10.00 <br />$2,330.00 <br />31 <br />PAVEMENT MESSAGES MULTI -COMPONENT <br />6 <br />EACH <br />$250.00 <br />$1,500.00 <br />Total Schedule B - NOWTHEN BOULEVARD TURN LANE CONSTRUCTION <br />$193,653 <br />TOTAL SCHEDULE A PLUS SCHEDULE B $739,875 <br />18 <br />