My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/24/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 05/24/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:50:05 PM
Creation date
5/20/2005 2:53:07 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/24/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # q <br /> <br />CONSIDER AUTHORIZATION OF IMPROVEMENT PROJECT #05-23 <br />EBONY STREET AND UTILTY IMPROVEMENTS <br /> BETWEEN 137TM AVENUE AND RIVERDALE DRIVE <br /> By: Steven J. Jankowski, City Engineer <br /> <br />Background: <br /> <br />ri'he City received a petition for various street and utility improvements on september 15, <br />2{)04. The attached ['easibility study outlining the project details, costs, and financing was <br />provided to each property owner and a public hearing was held on March 22, 2005. The <br />sixty day waiting period specified by Section 4.60.05 Sub. 1 of City Code for projects of <br />this nature has now passed and the Council may now act to order the preparation of plans <br />and specifications for the work outlined in the feasibility study. <br /> <br />Tltc improvements include looping the watermain between 137th Avenue and Riverdale <br />I)rive to improve fire flow capabilities and water system reliability, narrowing the <br />roadway which is excessively wide, providing a bituminous overlay on the street because <br />of' the poor condition of the pavement, adding concrete curb and'gutter, and a five foot <br />sidewalk along the east side of the roadway. Portions of the project are to be financed <br />through special assessments to adjacent properties. Below is a summary of the financing <br />l'or various elements of the project improvements: <br /> <br /> Lateral Watermain Street Conc C&G Sidewalk Total <br />Funding Source S&W Looping Imprvmnts Imprvmnts Imprvmnts Project <br /> <br />Special Assmnt $ 48,960 $ $ 13,199 $ 14,462 <br />S & W Trnk Fund $ $ 33,113 $ $ - <br />City Gert Fund $ $ $ 13,198 $ 7,538 <br />City Trail Fund $ $ $ · $ <br /> TOTAL $ 48,960 $ 33,113 $ 26,397 $ '221000 <br /> <br />$ - $ 76,621 <br />$ - $ 33,113 <br />$ $ 20,736 <br />$ 20,188 $ 20,188 <br />$ 20,188 $150,658 <br /> <br />Recommendation: <br /> <br />StalT recommends that this project be ordered and that the City Council direct that staff <br />prepare plans and specifications for the improvements. <br /> <br />Action: <br /> <br />M orion to adopt resolution 05-05-XXX ordering Improvement Project #05-23, Ebony <br />Street and Utility Improvements Between 137th Avenue and Riverdale Drive, and that <br />stal'ff be directed to prepare plans and specifications for the improvements. <br /> <br />Reviewed by: <br />Public Works Director/Fire Chief <br />A ssi stant Public Works Director/Principal Engineer <br /> <br />C(;: 05/24/05 <br /> <br />-269- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.