Laserfiche WebLink
PROPOSED IMPROVEME:NTS <br /> <br />7 m.~ project anticipates the extension of an eight inch sanitary sewer north along the <br />centerline of Ebony Street a distance of 400 feet. This extension will provide sewer <br />availability to the following properties; <br /> , Parcel D (2 lateral stubs) <br /> o Parcel E (1 additional stub) <br /> - Parcel H (1 stub) ' <br /> <br /> ,~ Parcel G (2 stubs for multifamily) <br />Sewer will not be extended fttrther north down Ebony Street as a part of this prOject, <br />sm.ce the parcel to the north are presently developed and have existing sewer service. In <br />addition an eight inch watermain will be connected the entire length of Ebony street <br />between t37~h Avenue and Kiverdale Drive, a distance of 1100-feet. One inch water <br />service stubs will be provided at each of the above sanitary sewer service locations with <br />the exception of Parcel G which shall be provided with a suitable sized, service to <br />a.ccommodate the multifamily unit proposed (This parcel is currently, zoned Commercial <br />and would need to be rezoned to accommodate the o. _wners desired land use). <br /> <br />The portion of the street through which sanitary sewer is to be extended is anticipated to <br />impact nearly the entire roadway. Consequently the street in this section will be <br />reconstructed 32 feet wide with a pavement section consisting of four inches of class 5 <br />base, two inches of bituminous base course and 1.5 inches of bituminous wear-course. <br />Only one half of the pavement will be removed through the northerly segment of the <br />roadway where the eight inch watermain is to be extended. Through this section of the <br />roadway the west half will be reconstructed to the above specifications while the east half <br />will receive a 1.5 inch bituminous overlay over the remaining pavement. <br /> <br />Concrete curb and gutter will be installed on both curblines. The Width of the street will <br />be reduced from 38 feet to 32 feet, and since there is existkng storm sewer running down <br />the western eurbline and the east curbline move six feet westward and the west curbtine <br />remain in its existing location. This }djUstment will result in the relocation of the <br />centerline of the street three feet west. A five foot wide concrete sidewalk will be <br />installed along the east side of the street one foot from the east fight of way line. <br /> <br />No changes to the existing storm sewer system are proposed: However, if the project <br />proceeds the condition of the existing storm sewer structures will be inspected. <br />Deteriorated structures will be repaired or replaced with funding fi.om the city's storm <br />w:.~ter utility. <br /> <br />All disturbed turfed areas will be replaced with four inches of topsoil and sod. Any <br />disturbed driveways shall be neatly sawcut and replaced with like materials and cross <br />sections. .. · <br /> <br />-3- <br /> <br />-275- <br /> <br /> <br />