My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/24/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 05/24/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:50:05 PM
Creation date
5/20/2005 2:53:07 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/24/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATED COSTS <br /> <br />A detailed itemization of project costs is presented in Appendix C. These costs have been <br />ag~egated into the four separate categories. Sanitary Sewer and WaterTnain Service <br />Extension costs include those costs associated with the extension of sanitary utilities in <br />order to provide service to properties currently without them. These costs include the <br />removal of existing pavement and the restoration of the class 5 and bituminous base <br />course through the portion of the project which would be' disturbed by the installation of <br />these utilities. Watermain looping costs include the northerly extension of the Watermain <br />a distance of 650 feet from the watermain service extension area through its connection to <br />the existing main. on Riverdale Drive. Tiffs watermain looping includes the costs <br />associated with pavement removal and restoration caused by its installation similar to the <br />sewer and .watermain service benefited area. <br /> <br />FINANCING <br /> <br />This project anticipates Utilizing a number of financing sources. The cost of the sanitary <br />sewer and lateral watermain which will provide service to those lots which do not <br />currently have these sanitary services available will be assessed the total cost identified as <br />· Sanitary Sewer and Watermain- Service Extension identified in Appendix C. These <br />costs include the removal of the existing pavement and the replacement of the bituminous <br />base course through the southerly 400 feet of Ebony Street. It is proposed that these costs <br />· be distributed among the benefited properties based upon front footage. The looping of <br />the Watermain to Riverdale Drive provides the benefit of increased flexibility to the entire <br />water distribution system. These costs are identified as Watermain - Looping in <br />Appendix C. It is proposed that these costs would be funded by the city utility trunk fund. <br /> <br />The cost of the sidewalk shall be completely funded by the city through the use ot~ the' <br />city trail fund. The cost of the concrete curb and gutter shall be assessed 100% to <br />Properties which will benefit from the sewer and water improvements, since this <br />improvement has 'a history of being associated with these City utilities. The remaining <br />properties shall have the cost of the cg..ncrete curb and gutter assessed 50% of its total <br />cost. It is proposed that 50% of the cost of the 'bituminous overlay improvements be <br />assessed based upon front footage to all property owners and that the remaining 50 % be <br />financed by the City General fund. This is consistent with the policy associates with the <br />annual street maintenance program. A summary of the project costs is presented below: <br /> <br />-276- <br /> <br />-4- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.