Estimated Costs <br /> <br />The following Outlines the assumptions used for the basis of the Estimated Cost of <br />Construction for the Ramsey Municipal and West Parking Facilities. <br /> <br />1. The base estimated amounts are for 2005 construction costs which have been <br /> escalated at an average annual rate of 6%. <br />2. The Construction Cost Estimates include 8% for General Conditions, Bonding <br /> and Insurance plus 5% for Overhead and Profit. <br />3. A 15% contingency is included to reflect the level of detail for the current design. <br />4. The project costs include soft costs estimated at 15%. <br />5. The Ramsey Municipal Parking Facility Estimate includes costs a canopied <br /> waiting area along the south side of Civic Center Drive. <br /> <br />Estimated Project Costs for Ramsey Municipal Parking Facility <br />Capacity 590 - 620 Cars <br />Footprint 275'x 185' <br />Floor Area 190,000 SF <br />Construction Date 2005 / 2006 <br /> <br />Date 1/12/05 <br /> <br />Item , Description Cost <br />1 G'e'-n. Condition~, Bonds, Insur., $;¢54,000.00 <br /> 2 Site Wor~Utilities/Lan. dscaping/P.a_vi~g $415,000.00 <br /> 3 Concrete Foundations and Structured Parking Areas '$§,348,000.00 <br /> 4 StairslElevatorslE. rnCiosureslArch Facade/Misc. $1,369,.9r.00..00 <br /> 5 Mechanical $114;000.00 <br /> 6 Electrical $427,500.00 <br /> SUBTOTAL ..... $6,128,400.00 <br /> Construction Overhead and Profit ~ 5% $306,400.00 <br /> SUBTOTAL $6,434,800.00 <br /> Design Contirngency @ 15%' ... . $965,200.00 <br /> Escalation Cost @ 6% annually $0.00 <br /> Probable Cost o~ C'onstruction ' -' $7,400,000,00 <br /> <br /> Soft Cos!s ~, 15% _ $1,I10,000.00 <br /> %;~al, ,Project Costs "' $8,510,000,(~0 <br /> <br />-398- <br /> <br />Januaw 2005 <br /> <br />Page 9 of 11 <br /> <br /> <br />