My WebLink
|
Help
|
About
|
Sign Out
Home
Bonestroo (Awarded Bid)
>
Comprehensive Plan
>
2008 Comp Plan RFP's
>
Bonestroo (Awarded Bid)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 2:50:33 PM
Creation date
10/15/2020 3:43:01 PM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Ramsey <br />2008 Comprehensive Plan Update <br />Proposal <br />.11VL <br />DSU <br />Bonestroo <br />■ Scope of Services <br />We propose a five -phase process as a framework for the comprehensive planning process, working with a task <br />force to be appointed by the City Council. The attached Process Diagram shows the phases in more detail. <br />Phase 1: Inventory and Analysis <br />This phase initiates the process with City staff, including gathering and summarizing information, and preparing <br />a draft background report. <br />1.1: Initiation Meeting <br />We will meet with City staff to initiate the process and outline roles, responsibilities, and timelines for the <br />planning process. <br />1.2: Data Collection and Analysis <br />Data will be collected and analyzed from the following <br />areas: <br />• Existing and Future Land Use <br />• Transportation <br />• Environmental Resources <br />• Economic Development <br />• Public Facilities <br />• Intergovernmental Coordination <br />1.3: Report Summaries <br />The following previous plans will be summarized for <br />inclusion in the final Plan: <br />• Master Housing Plan <br />• Comprehensive Sewer Plan <br />• Comprehensive Water Plan <br />• Park and Trail Plan <br />• Central Rural Reserve Study <br />• Natural Resources Inventory <br />• Capital Improvement Plan <br />• Open Space/Greenway Plan <br />Existing and future land use will be studied <br />during the data collection and analysis <br />portion of Phase 1. <br />1.4: Background Report <br />A Background Report will be prepared summarizing the collected information noted above. <br />Deliverable: Draft Background Report of data and existing studies. <br />1.5: Task Force Meeting — Background Report <br />We will facilitate a task force meeting to present the Background Report and collect input. <br />1.6: PC/CC Workshop Meeting — Background Report <br />We will facilitate a joint Planning Commission and City Council Workshop to present the Background Report <br />and collect input. The process will only move to Phase 2 once approval of the Background Report has been <br />given by the City Council. <br />Deliverable: Final Background Report. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.