Laserfiche WebLink
Contents (continued) <br />7_5 Pilot Study Results 28 <br />7.6 Filter Sizing 28 <br />7.7 Treatment Alternative 1 - Gravity Filter Layout 28 <br />7_8 Treatment Alternative 2 — Pressure Filter Layout_ 30 <br />7,9 Backwash Alternatives 32 <br />8 Architectural Design 33 <br />9 Utility Space Needs Evaluation 34 <br />10 Preliminary Site Planning 34 <br />11 Impacts to Nearby Properties <br />12 Capital Cost Opinions 35 <br />13 Life Cycle Cost Opinions 35 <br />14 Alternative Evaluation & Recommendation .. ... <br />15 Funding 37 <br />15.1 Drinking Water Revolving Fund Loan 37 <br />15.2 Grants 37 <br />16 Effect on Water Rates 38 <br />17 Public involvement 38 <br />18 Schedule 38 <br />List of Tables <br />Table 1 — Well Data 1 <br />Table 2 — Hydrant Flow Test Results 3 <br />Table 3 — Water System Static Pressures 4 <br />Table 4 — Minimum Fire Flows 6 <br />Table 5 — Water Quality - Primary Drinking Water Standards <br />Table 6 — Manganese in Ramsey Well 10 <br />FEASIBILITY STUDY -DRAFT RAMSY 154354 <br />