Laserfiche WebLink
Contents (continued) <br />Table 7 — Iron and Hardness in Ramsey Wells 10 <br />Table 8 — Projected Water Demands 12 <br />Table 9 — Bedrock Aquifers 14 <br />Table 10 — Ramsey Well Data F F F 4 F4 4 F4 4 F4 F4 F F4 F 15 <br />Table 11 — Drawdown in Ramsey Wells F F4 F 19 <br />Table 12 — Capital Cost Opinion Summary Gravity Filter Water Treatment ....... 34 <br />Table 13 — Capital Cost Opinion Summary Pressure Filter Water Treatment Plant 35 <br />Table 14 — 50-Year Life Cycle Cost Summary Gravity Filter Water Treatment Plant..35 <br />Table 15 — 50-Year Life Cycle Cost Summary Pressure Filter Water Treatment Plant36 <br />List of Figures <br />Figure 1 —ADD Diurnal Curve 5 <br />Figure 2 — MDD Diurnal Curve „ 5 <br />Figure 3 — Terms Relating to Well Performance 17 <br />Figure 4 — Well 5 Drawdown and Recharge 18 <br />Figure 5 — Drawdown in Observation Well 8 <br />List of Appendices <br />Appendix A Existing Water System Map <br />Appendix B Modeling <br />Appendix C CCL <br />Appendix D Groundwater Modeling Memo <br />Appendix E Pilot Study <br />Appendix F Gravity Filter Layouts <br />Appendix G Pressure Filter Layouts <br />Appendix H Architectural Renderings <br />Appendix I Treatment Plant Sites and Raw Watermain <br />Appendix J Capital Cost Opinions <br />Appendix K Life Cycle Cost Opinions <br />FEASIBILITY STUDY -DRAFT RAMSY 154354 <br />