Laserfiche WebLink
Clyde Prem, AICP <br /> Senior Transportation Planner <br /> Experience, Continued <br /> the evaluation of track conditions and use and developing ridership <br /> forecasts. <br /> • MetroPlan—Traffic Shed Demonstration Project— served as served <br /> as Co-Project Manager for a demonstration project funded by <br /> Transportation, Community and System Preservation (TCSP)funds. <br /> Included developing the GIS mapping and preparing capacity <br /> estimates used to evaluate growth thresholds that would be supported <br /> by a rural roadway system. <br /> • MoDOT 1-70 First Tier Environmental Document—coordinated the .� <br /> traffic analysis and socio-economic elements in the preparation of <br /> the environmental document. Completed traffic capacity analysis, <br /> estimated freight movements, and evaluated feasibility of high speed <br /> passenger rail transit. <br /> • MoDOT Long Range Transportation Plan—assisted MoDOT in the <br /> preparation of the highway element of the plan.Also assisted in ^ <br /> financial analysis and the compilation of each modal technical report <br /> and documentation. ^ <br /> • MoDOT 1-70 Major Investment Study, Kansas City, Missouri—served <br /> as coordinated HNTB activities including the analysis of the CBD <br /> loop, evaluation of alternative strategies and preparing project cost <br /> estimates. <br /> • Platte County, Missouri, Roads Master Plan—project manager <br /> and principal planner for the completion of a county-wide roads <br /> master plan. This plan involved extensive land-use planning and <br /> transportation planning coordination. The plan utilized a "traffic shed" �• <br /> analysis technique in the unincorporated areas of the county to analyze <br /> traffic impacts and to determine the appropriate land-use development <br /> —transportation infrastructure balance. <br /> • San Antonio,Texas, Metropolitan Arterial Analysis-task leader to <br /> complete the functional classification assessment of the major street <br /> plan. Access management guidelines were also developed for each <br /> functional classification. <br /> • Wentzville, Missouri,Transportation Master Plan -project manager for <br /> preparation of master plan. The plan included analyzing future year <br /> land uses and traffic forecasts, preparing a future year list of projects, <br /> future year functional classification, access management guidelines, <br /> traffic impact study procedures and a traffic counting program. <br /> • Batavia-Crosstown Traffic Study, Batavia, Illinois—served as project <br /> manager responsible for developing an analysis procedure and <br /> conducting a comparative study of a few potential bridge crossings and <br /> their impact on circulation for this traffic study. <br /> • DST Realty-Parking Garage Impact Study, Kansas City, Missouri—served <br /> as project manager responsible for coordinating the client's needs,the <br /> production process and meeting city requirements for this parking <br /> • El Dorado Northwest Trafficway Feasibility Study, El Dorado, Kansas <br /> —served as project manager for this feasibility study to determine if '- <br /> extension of NW Trafficway is warranted. <br /> OLSSON <br /> 2 ASSOCIATES / <br />