My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 10/27/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:08:21 PM
Creation date
10/22/2020 4:22:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Alternatives for providing services most efficiently through shared <br />facilities with other cities or local governments. <br />The City has considered the eight points as they relate to the projects <br />identified in Appendix A and more thoroughly defined below through the <br />issuance of CIP Bonds. The findings are as follows: <br />Conditions of City Infrastructure and Need for the Project <br />The existing Public Works facility is housed in three (3) separate <br />buildings and a temporary construction trailer for office space. The <br />existing buildings are over 40 years old, are not energy efficient, do not <br />provide for a safe working environment for staff, are inefficient and do <br />not provide adequate vehicle storage space. <br />The space limitations and a desire for increased operational efficiencies <br />drive the need for this project in the City. Renovation and/or expansion <br />on the existing site doesn't make sense due to the need for more space. <br />Demand for the Project <br />A new facility is needed to provide a safe work environment, better <br />layout for more efficient workflow and indoor storage to maintain fleet <br />quality and reduce maintenance expenses on vehicles. <br />Estimated Cost of the Project <br />The project is preliminarily estimated to cost up to $20,000,000 inclusive <br />of construction and soft costs. Construction contracts were awarded on <br />September 8, 2020 for the first bid package and the 2nd bid package is <br />anticipated to be awarded on November 10, 2020. The final bonding <br />amount, not to exceed $10,000,000, will be subject to City Council <br />approval of contracts for the project. <br />Availability of Public Resources <br />The City has identified a portion of the project is to be funded by general <br />obligation bond proceeds and supplemented by other available capital <br />resources on hand. Given the size of the project, debt is necessary to <br />provide for the costs and preserve necessary operating resources for the <br />City. <br />City of Ramsey, MN <br />Five -Year Capital Improvement Plan for Bond Issuance 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.