My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 10/27/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:08:21 PM
Creation date
10/22/2020 4:22:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Level of Overlapping Debt <br />Taxing District <br />Taxable Net Tax <br />Capacity <br />% in City <br />Total G.O. Debt <br />City's Share <br />Anoka County <br />I.S.D. No. 11 (Anoka - Hennepin) <br />I.S.D. No. 728 (Elk River) <br />Metropolitan Council <br />$428,393,476 <br />285,890,418 <br />93, 894, 622 <br />4,576,187,142 <br />7.35% <br />9.88% <br />3.47% <br />0.69% <br />$59, 945, 000 <br />258, 745, 000 <br />303, 850, 000 <br />230,225,000 <br />$4,408,475 <br />25, 565, 558 <br />10, 540, 557 <br />1,585,099 <br />City's Total Share of Overlapping Debt <br />Relative Costs and Benefits of Alternative Uses of the Funds <br />$42,099,689 <br />There are no significant alternatives for funds designated for this project. <br />The City purchased the new site for the public works facility in 2008 in <br />anticipation of having a larger site that could accommodate a new <br />facility, along with required storage for vehicles and other operational <br />needs. The City is also dedicated other City funds to the project <br />(approximately $10 million), to reduce the need for issuing bonds. <br />Operating Costs of the Proposed Improvements <br />The City doesn't anticipate any operational cost savings from the new <br />facility as it will be larger than the existing buildings combined but <br />expects efficiencies in operations from having all staff housed in one <br />facility and having room on site for equipment and storage. <br />Moving forward with a full-scale replacement facility will provide the <br />space and functionality necessary to sustain public works operations for <br />the next 30 to 50 years. Significant repairs to the new structure would <br />not be necessary for several decades. In addition, new shelter for <br />essential vehicles and equipment will reduce repair and replacement <br />costs. The replacement facility will be a safer and healthier place for staff <br />to work, with a thoughtful design that reduces exposures to toxins. <br />City of Ramsey, MN <br />Five -Year Capital Improvement Plan for Bond Issuance <br />
The URL can be used to link to this page
Your browser does not support the video tag.