My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 06/09/2005 - Joint with CC
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2005
>
Agenda - Parks and Recreation Commission - 06/09/2005 - Joint with CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 3:09:04 PM
Creation date
6/7/2005 8:12:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Title
Joint with CC
Document Date
06/09/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trail *Corridor Descriptions <br />and Cost Estimates <br /> <br />10o Trunk Highway #47 Trail <br />'l'bis trail i.s a north-south on-road trail in the eastern area of the City. The <br />trail paralld~; Saint Francis Boulevard NW and on the southern edge of the <br />t~ail ~:t~ns f~-om Nowthen Boulevard NW north as an existing trail until 153~ <br />,~,v<~,u<: N\U It then becomes a proposed trail until it ends at Green Valley <br />R,)ad N\Xi ~l'he trail consists of existing and proposed on-road trail descriptions <br />a~td ~'oad c~:,~ssings. <br /> <br />Estimated Trail Length: 4.23 miles long <br />Cost Estimate: $509,256 <br />Trail cost summary: <br />Upland cost: 3.95 miles x $16/LF = $333,696 <br />Wetland costs: <br />Wetland A = 75% wet soils <br />Wetland B = 20% sat. soils <br />Wetland C = 5% floating <br />Wetland crossing length = 0.28 miles <br />(.,~): 0.21 miles x $96/LF = $106,445 <br />(B): 0.056 miles x $140/LF = $41,395 <br />((~): 0.014 miles x $375/LF = $27,720 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.