My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 06/09/2005 - Joint with CC
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2005
>
Agenda - Parks and Recreation Commission - 06/09/2005 - Joint with CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 3:09:04 PM
Creation date
6/7/2005 8:12:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Title
Joint with CC
Document Date
06/09/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trail'Corridor DesCriptions <br />and Cost Estimates <br /> <br />Miscellaneotls Trails <br /> trails exist throughout the City and are of various design types. The <br /> rhe~,c miscellaneous trails is greater than the 10 Primary Trail Corridors <br /> herein. The reali~ is that there are many short segments that can <br /> impot:tant connections that add to the overall network of the trail <br /> [)t ti il; is difficult to plan the timing o f hoxv they will be implemented <br /> g?-Ol, illd. <br /> <br />i';i~ ~cc misceiI:meous trails are not necessarily defined by a corridor, discretionary <br />iundi~g must be awfilable to fund the development of these tra.ils when the <br />~,pp()rt~_mit7 arrives. It may be a short connection of a new development to a <br />park, (,r (~rher destination. In effect, the 10 Primary Trails become the backbone <br />,)r large,' grid of the trail system and interconnected by miscellaneous shorter <br />ix:ails; fi~fish thc net~vork. <br /> <br />Esti:nated Trail Length: 72.10 miles long <br />Cost Estimate: $9,085,718 <br />Trail cost summary: <br />{,~pland cost: 66.58 miles x $16/LF = $5,624,678 <br />\Vc'~ land costs: <br />Wetland A = 75% wet soils <br />Wetland B = 20% sat. soils <br />Wetland C = 5% floating <br />x,'4'~tland crossing length = 5.52 miles <br />(.:\): 4.'14 miles x $96/LF = $2,098,483 <br />(B): '1. 104 miles x $140/LF = $816,077 <br />(C): 0.276 miles x $375/LF = $546,480 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.