My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 06/09/2005 - Joint with CC
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2005
>
Agenda - Parks and Recreation Commission - 06/09/2005 - Joint with CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 3:09:04 PM
Creation date
6/7/2005 8:12:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Title
Joint with CC
Document Date
06/09/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure VI.6 <br /> <br />Shared Use Trail in an Off-Road Setting <br /> <br /> il 5;¢p:lf'i![('d trail systeIn is not <br />p{>,svfibh:, a shared use trail may be <br />cot~sidcred. The trail should be at least <br /> wide and bc separated from the <br />cd.~? of Ibc trail casement or right <br />v/ny by at least 10'. <br /> <br />In most cases, if recommended off-road trail easements are acquired, there <br />should be enough space to move the trail around obstacles and still maintain a <br />10' separation from the edge of the property line or easement within the 35' to <br />75' minimum corridor. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.