My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/08/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 12/08/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:11:01 PM
Creation date
12/8/2020 1:13:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/08/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
828
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Safety Deficiency. Describe the issues on the rural County State Aid Highway that you are <br />attempting to address. Transportation deficiencies could include substandard roadway <br />structure, lane or shoulder width, conditions related to certain types of crashes, and other <br />conditions that negatively impact the public. Be specific on how the problem or issues were <br />identified and what harm it presents to the traveling public. Answer this question even if your <br />project is identified in a county safety plan or the Minnesota Strategic Highway Safety Plan. <br />5. Improvement. Describe how the project will address the safety deficiencies, improve safety, <br />and reduce fatal, injury, and/or property damage crashes. Be specific as possible in explaining <br />why the project and safety strategy chosen is the most effective and provides the most benefit, <br />including the expected crash modification factor. Answer this question even if your project is <br />identified in a county safety plan or the Minnesota Strategic Highway Safety Plan. <br />E. Project Readiness and Ability to Maintain <br />This section will be used to gauge the readiness of the project. Bond funds will expire and begin the cancellation <br />process after four years, so it is important that projects selected for LRIP funding can be delivered within that <br />timeframe, with minimal risk of delay. <br />1. Construction Year. Use the drop -down box to select the anticipated construction year of the project. <br />Projects should be ready for construction in 2021, 2022, or 2023. <br />2. Railroad Impacts. Use the drop -down box and provide a narrative as necessary to indicate whether your <br />project has railroad crossings or is adjacent to railroad tracks which may require additional coordination <br />and agreements. Choose from the following options: <br />• No RR crossings or RR tracks within 600' <br />• Yes. Necessary RR permits)/agreement(s) obtained <br />• Yes. Will obtain RR permit(s)/agreement(s) as needed <br />3. Project Status. Use the drop -down box and provide a narrative as necessary to indicate the status of the <br />design work on the project. Design includes any site surveying or study, developing plan sheets, <br />specifications, and engineering estimates. Select from the following choices that best reflects the status <br />of the design work on the project. <br />• Design work has not started. Select this option if no site survey has been done, project not yet <br />planned/programmed in a Capital Improvement Plan or approved by the local jurisdiction. <br />• Design in progress. Select this option if site survey has been done, project is approved by local <br />jurisdiction to proceed and plans are being developed. <br />• Design completed (plan completed). Select this option if your project is approved by the local <br />jurisdiction and the plan is approved by the responsible engineer. The plan is ready to be <br />reviewed and approved by the MnDOT State Aid District Engineer. <br />4. Federal Funding. Use the drop -down box to indicate whether this project been selected for federal <br />funding? If so, in what year is it identified for construction in the State Transportation Improvement <br />Program (STIP)? <br />5. Right of Way Acquisition. Use the drop -down box and provide a narrative of the status of right of way <br />acquisition, including both permanent and temporary acquisitions, if required. The answer from this <br />http://www.dot.state.mn.us/stateaid/Irip.html 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.